On an inherited cell, the operator's small off-sheet task turned out to be essential to every acceptable part. I'd begin with whoever did the correction and whoever accepted the finished bracket, then involve the welding lead in deciding what a current-part trial needs to measure
The final bracket report skips the first released measurement
PavelCarter0962 · 13 Jun 2025, 15:23 UTC
I'm reviewing a UR5e welding proposal whose old bracket report jumps from clamped alignment to acceptance after correction. The new layout omits that correction bench. Who should explain the missing stage before this becomes an assumed saving?