Our FR10 panel report begins with one sheet already separated
BethBrooks0846 · 14 Oct 2025, 22:24 UTC
21 replies
We had two thin sheets arrive together under a perfectly happy vacuum indication. The tool had a seal; the process did not know how many sheets it had. Ask the supplier to demonstrate separation from your actual stack and an explained check for no panel, one panel and an unwanted second panel.
12pointsDoes their offer include stack preparation, or only the vacuum head?
3pointsLeah, did you end up separating sheets manually for that job or adding automated separation?
11pointsManual preparation into a single-sheet pickup position for that trial. It let us investigate the transfer, but we counted the preparation work instead of presenting it as an automated stack solution. The production choice remained a separate question.
9pointsBeth, is the objective to remove the stack-handling work as well as the transfer, or could a prepared single-panel feed still meet the requirement?
7pointsLiam, the offer prices the head and transfer integration, with stack preparation unspecified. Rosa, we wanted less manual handling overall, but haven't said that clearly enough to distinguish a prepared feed from automatic separation.
-9pointsWho will compare those two complete methods?
21pointsBring the operator into that comparison. A prepared feed might help, or it might just move the awkward work to a new bench. Our first sketch gave the robot a lovely pickup and gave the person all the difficult edges.
5pointsCan the supplier show how the far corners are supported during the full transfer too, Beth, rather than only the patch under the cups?
12pointsThe current clip crops off two corners and ends before release. I've asked for the whole panel through the intended motion into our nest. Our production lead will compare the two feed methods with the operator and tooling team.
2pointsInclude the material between panels in that scope if your supply uses any; our packing plan once omitted the interleaves because they were absent from the attractive demonstration stack.
18pointsAnd who handles an uncertain panel count?
4pointsRosa, were the interleaves an extra automatic step in your eventual proposal or part of the manual preparation?
25pointsManual preparation in the version we priced, with disposal included; the automatic alternative remained a separate, larger scope rather than an assumed feature of the pickup head.
1pointsLiam, that response needs agreeing for Beth's package. An uncertain count should not be treated as a single panel just because the vacuum reading is acceptable. The operator also needs a workable recovery arrangement.
5pointsWe receive some stacks with interleaves, Rosa. They are now in both method descriptions. Tooling is proposing a count check and recovery arrangement for review, not one already tested. The operator wants the prepared-feed handling assessed before we rule it out.
20pointsWill that comparison include a whole order and clearing the preparation area?
17pointsYes, preparation, transfer, interruptions and clearing. Thanks, Leah, your single-sheet example helped us explain what a limited trial can answer. We have two defined proposals to request now; neither feed method is selected.
6pointsKeep release in the requested demonstration too. It is easy to get absorbed in picking exactly one panel and forget that it still has to reach the nest without a person peeling it off the tool.
14pointsAnd the corner-support question remains whichever feed method wins; manual separation does not change what the tool must support during its transfer.
5pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .