Sorting the old steel-bracket sheets for our proposed FR5 job. 'Aligned' while restrained, outside the drawing after release. Correction noted, method missing. I need to separate fit-up, location and final inspection (before we budget that correction as if we understand it).
Then I wouldn't subtract anything from anything; on a previous bracket discussion I meant compare the contact conditions, not pick whichever support makes the numbers look nicer
Understood. The old sketch doesn't identify the supports either. I've put that gap beside the correction entry for the estimator. Better an obvious unknown than a tidy but fictional cycle time.