N

Universal Robots UR5e: The PLC asks for inspection-cycle coordination, but the application misses it

NathanBarnes0547 · 15 points · Applications & integration · 30 Aug 2026
4replies
D

The layer pattern fits, but some cartons sit over gaps (Fairino FR10)

DineshAbbott0038 · 31 points · Applications & integration · 26 Aug 2026
10replies
C

our FR10 bracket plan needs the correction between release and acceptance explained

CarlaAdams0140 · 32 points · Applications & integration · 24 Aug 2026
21replies
A

I added the tray locator, then a replacement tray missed again

AdaAli0216 · 26 points · Applications & integration · 15 Aug 2026
8replies
R

The fixture holds nominal shape. What happens after release? (Fairino FR5)

RaviAbbott0041 · 17 points · Applications & integration · 12 Aug 2026
18replies
K

Separating fit-up, restraint and final inspection (Fairino FR10)

KaiChen1150 · 30 points · Applications & integration · 3 Aug 2026
10replies
J

a gusseted angle-bracket assembly moves after release in our old inspection notes

JonasBaker0459 · 13 points · Applications & integration · 23 Jul 2026
11replies
H

I liked the trial, but the demonstrator did most of the preparation (Universal Robots UR5e, fixture-to-tray transfer)

HarishArcher0402 · 22 points · Reviews & comparisons · 22 Jul 2026
14replies
F

A supervised workshop demonstration: What should my tray-to-fixture transfer review say about operator help?

FionaArcher0412 · 23 points · Reviews & comparisons · 16 Jul 2026
2replies
T

A compact fixture loading station: A better-looking pickup isn't the whole result

TobyBrown0927 · 32 points · Applications & integration · 16 Jul 2026
14replies
P

The tooling supplied with our Universal Robots UR5e isn't what was demonstrated (transferring small assembly shells)

PriyaCarter1003 · 20 points · Applications & integration · 12 Jul 2026
20replies
D

182 housings planned, but our FR10 counter is counting some twice

DanielAllen0304 · 32 points · Applications & integration · 8 Jul 2026
10replies
L

UR5e layer support is still an arrow while dispatch needs partial pallets

LeahBrown0930 · 21 points · Applications & integration · 4 Jul 2026
7replies
T

What does an empty pocket mean in the FR5 job I handed over?

TobyBrooks0840 · 27 points · Programming & support · 3 Jul 2026
19replies
A

Did detailed UR5e logging stall acquisition or only my screen?

AdamCarr · 22 points · Programming & support · 30 Jun 2026
1replies
M

Old FR10 coupon completion jumps into the new attempt in our test

MiaBarnes0557 · 19 points · Programming & support · 23 Jun 2026
17replies
C

How do I hand over FR5 empty-pocket decisions without remaining part of the machine?

CarlaChen1184 · 14 points · Programming & support · 23 Jun 2026
18replies
M

fr10 suffix and flange adapter differ from our confirmed housing setup

MayaBell0649 · 12 points · Buying advice · 20 Jun 2026
8replies
E

What should count as dimensional acceptance after welding? (Fairino FR5)

EllaBrown0903 · 5 points · Applications & integration · 7 Jun 2026
17replies
M

The layer pattern fits, but some cartons sit over gaps (Fairino FR10)

MeiChan1125 · 26 points · Applications & integration · 6 Jun 2026
6replies