Which comparison should justify our delivered FR5 interface bracket?

TheoAbbott0062 · 19 Apr 2026, 12:35 UTC

Reply to discussion
TH
TheoAbbott0062
I have left our tooling unfitted because the delivered FR5 interface bracket differs from the configuration accepted against our fixture drawing. The label suffix differs too. After forty days, the seller still offers equivalence without an identified comparison. I need the complete assembly assessed before treating this as a harmless revision.

2 replies

DA
DavidBrown0954
Replying to TheoAbbott0062

Has the seller identified the supplied bracket drawing against the delivered package? Give your integrator that and the accepted arrangement, including the connections, so the actual differences can be assessed.

10 points
TH
TheoAbbott0062
Replying to DavidBrown0954

The supplied drawing is now identified. It shows a different connection position, and our integrator has requested the complete loaded assembly information before comparing access and the intended sample transfer. The seller has not supplied that data yet.

16 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.