Our FR5 panel quote tests a loose sheet, not the incoming stack

AmaraAllen0339 · 11 Apr 2026, 02:37 UTC

Closed
AM
AmaraAllen0339
Supplier shows the vacuum tool holding one aluminium enclosure panel. Our job starts with stacked panels and ends in an assembly fixture. Separation and support through that move are still unexplained.

6 replies

JA
JamieBarnes0556
Replying to AmaraAllen0339

Give the supplier representative incoming stacks and the receiving fixture details, then ask for the proposed separation, support and single-panel confirmation through the complete sequence, including how a suspected double is handled.

23points
AM
AmaraAllen0339
Replying to JamieBarnes0556

Stacks have protective film on alternate faces. Their test sheet had no film. I have added that difference to the sample request.

17points
CH
ChloeBarnes0570
Replying to AmaraAllen0339

Does anyone remove that film before this operation?

14points
AM
AmaraAllen0339
Replying to ChloeBarnes0570

No. It stays until the next assembly stage. The proposal must handle panels in that incoming condition.

9points
JA
JamieBarnes0556
Replying to AmaraAllen0339

Then ask them to demonstrate that actual condition through release into the fixture, not infer it from a bare-sheet seal, with the panel support and any manual separation work visible.

24points
CH
ChloeBarnes0570
Replying to JamieBarnes0556

Who clears a suspected double, and can they reach the stack without dismantling the tool?

-1points

Discussion closed