Independent integrator supporting inherited cells

JamieBarnes0556

Jamie Barnes

JB
GermanyJoined26 Jul 2025216posts

About

Independent integrator supporting inherited cells. Currently exploring machine tending and fixtures. Working around an ageing control cabinet; planning a 13-week trial before making a decision.

Machine tendingFixtures

Conversations

M

A paid feasibility demo: what files should I leave with?

MartaBench_1e8fbe · 0 points · Buying advice · 15 Sept 2026
7replies
G

The finished blank clears, the second jaw might not

GabrielBarnes0540 · 32 points · Fairino robots · 4 Sept 2026
14replies
D

What should replace this bare-arm FR5 loading sketch?

DineshAllen0299 · 19 points · Fairino robots · 28 Aug 2026
14replies
S

A precision metal-parts inspection area: Universal Robots UR5e inspection plan: scratches or changing reflections?

SaraAdams0113 · 32 points · Programming & support · 26 Aug 2026
20replies
Z

Which FR10 layer view tests the support under our rotated product boxes?

ZaraCarter1004 · 22 points · Applications & integration · 24 Aug 2026
5replies
J

FR10 brass-loading sketch gives no space to the actual hand

JamieBarnes0556 · 12 points · Fairino robots · 21 Aug 2026
3replies
J

the UR5e unloading report is old but the event evidence is thin

JonasBaker0459 · 19 points · Buying robots from China · 15 Aug 2026
21replies
J

Why does the documented FR5 read time out when another laptop once worked?

JuliaAli0239 · 13 points · Fairino robots · 14 Aug 2026
10replies
E

a steel gusseted bracket assembly moves after release in our old inspection notes (Universal Robots UR5e)

EmmaBrown0898 · 17 points · Applications & integration · 13 Aug 2026
13replies
S

Does our machine-tending layout actually fit the complete tool? (machine fixture unloading)

SarahAbbott0067 · 23 points · Fairino robots · 11 Aug 2026
8replies
Z

Checking the nest before agreeing to more clamp force (Fairino FR10)

ZaraCarter1004 · 7 points · Applications & integration · 10 Aug 2026
11replies
S

A workshop status-monitoring station: A plausible status from a failed request

SamChan1116 · 11 points · Programming & support · 7 Aug 2026
4replies
V

Fifteen days at label created for our FR10 inspection-tray order

VictoriaCasey · 22 points · Buying robots from China · 30 Jul 2026
1replies
R

I cannot schedule the 29-blank FR5 proposal from its reachable fixture point

RosaBrooks0814 · 30 points · Fairino robots · 28 Jul 2026
12replies
E

One ready word is hiding two events in my FR10 interface notes

Eli_Casey · 16 points · Programming & support · 28 Jul 2026
4replies
K

Why is our UR5e dashboard nearly finished when it is counting retries?

KaiArcher0367 · 33 points · Applications & integration · 27 Jul 2026
2replies
N

Our open machine door is missing from the layout (Fairino FR5)

NoahAllen0281 · 22 points · Fairino robots · 21 Jul 2026
10replies
I

Fairino FR10: Before we add restraint to a fixture we don't fully understand

ImranCarter1001 · 29 points · Applications & integration · 15 Jul 2026
20replies
S

FR10 polymer-blank loading sketch without the open door

Simon_Carr · 16 points · Fairino robots · 29 Jun 2026
8replies
B

FR10 read-only script stranded between SDK folders

BrunoAllen0278 · 36 points · Fairino robots · 28 Jun 2026
7replies