Fixture assumptions shouldn't live only in someone's head

BenAllen0283 · 30 May 2026, 08:05 UTC

Reply to discussion
BE
BenAllen0283
I'm preparing our sample verification handover for Universal Robots UR5e in a maintenance review of a commissioned inspection cell, using a sample housing. The notes are mostly pendant screenshots without revision details. They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. I need a usable structure while the original integrator is still available.

2 replies

HE
HenryBell0612
Replying to BenAllen0283

Start by identifying the installed program revision and its corresponding controlled export. Can you establish that link before describing the routine's dependencies?

18 points
BE
BenAllen0283
Replying to HenryBell0612

@HenryBell0612 I've matched our installed revision to an export. Some screenshots belong to an older copy, though. That explains the names that weren't lining up.

18 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.