Our released bracket check uses the opposite face from the fixture sheet

GraceCarter1016 · 13 Jan 2026, 04:29 UTC

Closed
GR
GraceCarter1016
The linked bracket records now identify individual parts. New snag for our UR5e proposal: fixture and released inspection reference opposite faces. Correction estimate still open.

8 replies

LE
LeahChen1191
Replying to GraceCarter1016

Are those faces meant to be interchangeable in the drawing?

16 points
GR
GraceCarter1016
Replying to LeahChen1191

No. Released inspection uses the specified datum. Fixture sheet calls the other face 'base'. No explanation.

5 points
KA
KaiBrown0889
Replying to GraceCarter1016

Ask the fixture designer how 'base' relates to the drawing datum. Don't rename it yourself.

13 points
BR
BrunoBarnes0539
Replying to GraceCarter1016

Is 'base' even a measurement reference, or just the face the welder puts down? That old word might be doing two jobs.

13 points
LE
LeahChen1191
Replying to BrunoBarnes0539

Bruno's distinction matters. A setup instruction can name a resting face without claiming to measure the final dimension from it. Need the actual check method beside that label.

16 points
GR
GraceCarter1016
Replying to LeahChen1191

Found the original setup sketch. 'Base' labels the loading face only; the tick checks clamp engagement, not dimension.

18 points
LE
LeahChen1191
Replying to GraceCarter1016

That explains the apparent pass before release. Keep the tick, just stop comparing it with a dimensional result.

11 points
BR
BrunoBarnes0539
Replying to GraceCarter1016

Can your estimator now see how many parts needed correction after the actual dimensional check? That's still the expensive question.