Maintenance electrician moving into robot support

LeahChen1191

Leah Chen

LC
IrelandJoined 10 Nov 202564 posts

About

Maintenance electrician moving into robot support. Currently exploring plc integration and palletising. Working around tight tooling clearance; planning a 16-week trial before making a decision.

PLC integrationPalletising

Conversations

C

Too many convenient contacts in our nest drawing? (Universal Robots UR5e, planning repeatable bracket location)

ChenChen1138 · 18 points · Applications & integration · 27 Aug 2026
1replies
L

What proves delivery of the specific crate assigned to the controller package? (loading inspection trays)

LeahChen1191 · 26 points · Buying robots from China · 12 Aug 2026
0replies
A

What should packaging approve for stacking a labeled dispatch carton? (Universal Robots UR5e)

AnilAdams0114 · 24 points · Applications & integration · 10 Aug 2026
11replies
M

How do I trace the bracket condition before its unexplained correction?

MeiBrooks0864 · 12 points · Applications & integration · 27 Jul 2026
20replies
L

A workshop packing department: Is alternating the layers actually right for our cartons?

LouisBennett0746 · 23 points · Applications & integration · 9 Jul 2026
7replies
N

Our robot handover is mostly screenshots (Fairino FR10)

NathanAdams0112 · 26 points · General robotics · 8 Jul 2026
6replies
L

The label-facing carton pattern still needs its support drawn underneath

LucyBennett0741 · 25 points · Applications & integration · 6 Jul 2026
6replies
T

Our FR10 spacer sequence has receipt dressed up as availability

TheoBell0671 · 20 points · Programming & support · 2 Jul 2026
20replies
L

How do I make this robot support ticket actionable? (tray unloading)

LeahChen1191 · 21 points · Buying robots from China · 29 May 2026
20replies
T

A bench handling station: Getting past 'please send details' for Fairino FR10

ThomasBell0625 · 30 points · Buying robots from China · 24 May 2026
6replies
O

The support request is open, but I'm unsure what evidence they need

OmarBell0665 · 13 points · Buying robots from China · 19 May 2026
16replies
L

Before I sign off a pallet drawing full of neat rectangles

LeahChen1191 · 28 points · Applications & integration · 3 May 2026
4replies
O

Is alternating the layers actually right for our cartons? (stacking packed cartons onto dispatch pallets)

OliverAdams0102 · 17 points · Applications & integration · 29 Apr 2026
20replies
L

The FR10 pallet section loses support beneath two turned cartons

LeahChen1191 · 19 points · Applications & integration · 5 Apr 2026
0replies
V

Component cartons supported by an imaginary sheet

VictoriaBriggs · 10 points · Applications & integration · 22 Mar 2026
11replies
B

fr5 request disappears before the application can say it received it

BenCarter0979 · 9 points · Applications & integration · 20 Mar 2026
18replies
C

two spacer demos, one tray nobody at our bench currently uses

CallumBrooks0795 · 11 points · Buying advice · 17 Mar 2026
4replies
J

our fr10 adapter puts the hose where the sample nest was

JackAli0254 · 17 points · Applications & integration · 24 Feb 2026
11replies
S

Our FR10 full-layer support check omits the order ending halfway through

StevenBowen · 7 points · Applications & integration · 31 Jan 2026
6replies
V

our ur5e pallet lesson shows support where the finger slot is

VeraBowen · 28 points · Applications & integration · 17 Jan 2026
8replies