We have 186 brackets in this inspection batch. The dashboard is nearly finished because it counts successful attempts, including reviewed retries after restart. I need the accepted-bracket total and the failed history to coexist. Removing the failed rows would make the screen tidy and the handover useless.
Use each bracket's current authorised disposition for the total. Keep its inspection attempts underneath the same bracket identity, including the failed ones.
The bracket identity survives, Mina. Attempt numbering restarts, which is a separate problem. The reviewed disposition list uses the stable bracket identity and says 171 accepted.
Where are the other fifteen brackets in the disposition list? Our bracket review hid correction work behind a final pass column. A smaller accepted total alone would not explain what is still waiting.
Aisha, ten awaiting reviewed decisions and five rejected. All 186 accounted for. Jamie, the export has its own old query, so it would indeed keep reporting the inflated number.
Developer's offline reconciliation now separates runs and attempts under each bracket. Importing the same export twice leaves 171 accepted and retains the same attempts. Both screen and export use the revised item view.
Try withdrawing an acceptance and restoring it after review; the total must follow the decision rather than the existence of a pass somewhere in history.
Added. Reviewed withdrawal reduces the test total once; restoration adds it once. Offline checks passed, but quality still needs to approve the installed report comparison before we replace the current batch sheet.