Start with one identified assembly and follow its original pages. Check the feature and measuring reference at each stage, as well as whether it was restrained or released. A shared job number may link a batch of work without proving the two results belong to one bracket.
Which bracket condition did the old FR5 proposal actually measure?
LucaArcher0352 · 19 Aug 2026, 17:55 UTC
I am reviewing the steel-gusseted-bracket records before our FR5 fixture inherits them: held alignment, released failure and unexplained correction, but how do I link the fit-up and location notes to the final measurement without inventing the missing stages?
4 replies
Add to the discussion
Welcome to Application Robot
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.