The FR10 fits once the drawing removes our door
HollyBailey · 6 Sept 2025, 22:33 UTC
16 replies
Maintenance has measured the door. Adapter is not defined yet, though the gripper supplier has supplied its body and finger drawings. I've put provisional on the sketch and asked who is designing the remaining piece.
17 pointsCheck the finger-open shape too. The closed tool may leave the blank in the right place and then hit something when it releases.
14 pointsIntegrator owns the adapter now. Open fingers are included. They found the loaded withdrawal crosses the door handle and proposed a shorter adapter or a different base position.
8 pointsBoth need proper review. The shorter adapter changes the loaded assembly as well as clearance, so include the applicable load assessment for the proposed motion. A base move has installation and access consequences of its own.
17 pointsCould a full-size tool envelope reject either candidate cheaply while the modelling catches up? It won't establish the whole application, but it might stop you paying for detail on an obviously blocked doorway.
-3 pointsYes, as an early clearance check. Keep it identified with the candidate geometry, though. A smaller convenient outline can give you a very encouraging answer to a question nobody intended to ask.
5 pointsWhere does the proposed new base go? Maintenance access is easy to forget when the immediate argument is all about a door handle.
16 pointsBruno, farther towards the end of the machine, beside the service panel. Noah, toolroom has the proposed envelopes for a first check. The setter is also checking fixture-change access at that position.
1 pointsInclude the trolley turning space if the setter uses one. I have seen a route drawn as a line that could only be followed by a trolley with no width.
16 pointsPanel removal too, not only opening its door. Sometimes the service job needs the piece lifted out and carried away.
21 pointsThe farther position obstructs panel removal, so maintenance ruled it out. Setter's trolley access was also poor. Shorter adapter remains a proposal; the first outline clears the handle, but the complete motion review is unfinished.
14 pointsDoes that remaining review include the loaded exit and empty return? Clearing the handle in one outline is useful, but I would keep the installation choice open until both routes are covered.
12 pointsAnd is the shorter adapter still a price the supplier stands behind, or did it become a new design charge? Worth keeping the cost next to the geometry decision.
14 pointsJasper, both routes are in the review. Noah, a revised design price is requested. No base or adapter accepted yet. The floor plan has the rejected location removed and the original one marked provisional.
6 pointsMake sure that panel-removal space stays on the drawing after the decision. It is still needed even when the robot moves somewhere else.