Fairino FR5: Our 112 starting batch doesn't answer the maintenance question

PavelBennett0701 · 12 Aug 2026, 07:02 UTC

Reply to discussion
PA
PavelBennett0701
Our proposed use of Fairino FR5 is filled pouch transfer with a small bagged hardware kit in a low-volume order packing area, starting with 112. Although the transfer motion works, changing products and bag shapes keep adding presentation work. I've invested substantial effort and find it difficult to step back, but I doubt whether the whole process justifies continued maintenance.

18 replies

EL
EllaAllen0294
Replying to PavelBennett0701

@PavelBennett0701 What happens when you include fixture adjustment and operator help in the comparison with manual packing? That's the process you're deciding whether to keep.

13 points
PA
PavelBennett0701
Replying to EllaAllen0294

@EllaAllen0294 Including fixture work and operator assistance leaves our manual baseline competitive. The motion is repeatable after preparation, but preparing the changing packages keeps expanding beyond what we originally allowed.

11 points
EL
EllaAllen0294
Replying to PavelBennett0701

Use that comparison for a bounded stop-or-continue review: remaining work, likely repeat demand and a spending limit. Agree what result could justify more effort before another fixture revision.

19 points
PA
PavelBennett0701
Replying to EllaAllen0294

How much weight should the effort already spent have? I know it's gone, but closing this still feels like throwing the work away.

13 points
AN
AnnaBaker0503
Replying to PavelBennett0701

@PavelBennett0701 On my own packing trial, repeated input changes led us to stop. Preserving the fixture designs and trial observations made the learning available without requiring the application to become a deployment.

19 points
EL
EllaAllen0294
Replying to EllaAllen0294

If the manual baseline is still competitive, I'd close it. You've already got the answer.

19 points
NA
NadiaAdams0117
Replying to EllaAllen0294

That's premature. They haven't established likely demand or the cost of the remaining work. Frustration and one comparison don't finish that review.

6 points
EL
EllaAllen0294
Replying to NadiaAdams0117

You're right; I treated an input to the decision as the decision itself. The review needs to consider remaining development and demand, with closure as a possible outcome rather than a foregone conclusion.

20 points
PA
PavelBennett0701
Replying to EllaAllen0294

@EllaAllen0294 I've checked the work coming in. There's little repetition of the setup we've demonstrated. That worries me more than whether another gripper tweak could work.

8 points
AA
AaronBennett0697
Replying to PavelBennett0701

Would narrowing the application to a single package type be a reasonable option, or would that require a different evaluation from the broad setup?

25 points
EL
EllaAllen0294
Replying to AaronBennett0697

It's worth assessing as a separate, narrower proposal if the demand exists. Give it its own costs and stopping conditions; it shouldn't inherit approval from the broader idea.

15 points
NA
NadiaAdams0117
Replying to EllaAllen0294

And don't assume that subset exists because it would rescue the story. Ask which real orders would use it.

1 points
PA
PavelBennett0701
Replying to NadiaAdams0117

At present I can't identify sufficient repeat work to support that narrower application. I'll retain it as an unproven option rather than treating it as our agreed direction.

14 points
AN
AnnaBaker0503
Replying to AnnaBaker0503

When we closed my separate trial, we documented conditions for reconsideration. That gave us a way to evaluate new samples without treating each one as automatic grounds to resume development.

14 points
PA
PavelBennett0701
Replying to AnnaBaker0503

I'd like a concrete basis for reconsideration. What did you use instead of a vague condition such as spare development time becoming available?

-1 points
AN
AnnaBaker0503
Replying to PavelBennett0701

Our conditions were credible recurring work for a specified package and a responsible person for a limited trial. Available time by itself wouldn't have changed the original constraint.

25 points
PA
PavelBennett0701
Replying to AnnaBaker0503

The team hasn't settled criteria for either further development or closure. Without that agreement, I can't present a justified plan to continue.

14 points
EL
EllaAllen0294
Replying to PavelBennett0701

Understood. Until the continuation criteria are agreed, another promise of progress wouldn't settle the decision.

18 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.