Packaging line changeover coordinator

AnnaBaker0503

Anna Baker

AB
North West EnglandJoined 3 Dec 2024146 posts

About

Packaging line changeover coordinator. Currently exploring buying robots from china and small-batch automation. Working around no spare production machine; planning a 4-week trial before making a decision.

Buying robots from ChinaSmall-batch automation

Conversations

E

Seller calls the substituted kit equivalent; how do I check that? (transferring small assembly shells)

ElenaAdams0166 · 37 points · Applications & integration · 4 Sept 2026
12replies
C

Our open machine door is missing from the layout

CalebBarnes0580 · 6 points · Fairino robots · 1 Sept 2026
14replies
E

The installed tool cable is here; the spare isn't - loading sample trays

EmmaAli0202 · 26 points · Buying advice · 1 Sept 2026
14replies
A

Our robot handover is mostly screenshots - sample verification

AnnaBaker0503 · 19 points · General robotics · 26 Aug 2026
2replies
R

Planning for 95, judging from mismatched demos - sorted tray loading

RebeccaAllen0343 · 24 points · Buying advice · 26 Aug 2026
4replies
A

Our FR5 controller-area arrival damage needs an assessment plan

AnnaBaker0503 · 34 points · Buying robots from China · 22 Aug 2026
18replies
M

Softer FR5 pads need an agreed housing-finish comparison

MeiAbbott0081 · 25 points · Buying advice · 17 Aug 2026
3replies
O

Our FR10 pendant-area delivery damage needs an assessor, not a power-on guess

OliverBrown0885 · 6 points · Buying robots from China · 14 Aug 2026
19replies
A

Same job label, wrong attempt marked complete (inspection-cycle tracking)

AlexChan1081 · 30 points · Programming & support · 12 Aug 2026
8replies
P

Fairino FR5: Our 112 starting batch doesn't answer the maintenance question

PavelBennett0701 · 28 points · Applications & integration · 12 Aug 2026
18replies
L

A planned enclosed machining cell: planning a lathe load-and-unload sequence: one status, conflicting definitions

LouisBennett0746 · 19 points · Programming & support · 11 Aug 2026
13replies
C

Our open machine door is missing from the layout

CarlaBell0662 · 14 points · Fairino robots · 8 Aug 2026
21replies
H

softer collar pads are proposed before we've agreed what counts as a mark

HenryBarnes0525 · 34 points · Buying advice · 30 Jul 2026
13replies
J

Prototype inspection fixture: I need more than an equivalence claim for this tooling

JackBennett0776 · 38 points · Applications & integration · 14 Jul 2026
1replies
O

Keeping diagnostic output from holding up the display (Fairino FR10, read-only diagnostic sampling)

OwenBrown0921 · 22 points · Programming & support · 10 Jul 2026
13replies
A

Our UR5e housing pickups improved until the replacement tray missed

AnnaBaker0503 · 28 points · Applications & integration · 21 Jun 2026
12replies
A

A supervised tray handling cell: Tracking a polymer sleeve through an interrupted transfer

AnnaBaker0503 · 40 points · Programming & support · 4 Jun 2026
3replies
C

A fixture point isn't the whole machine-tending approach (machine fixture unloading)

CarlaArcher0401 · 13 points · Fairino robots · 29 May 2026
8replies
F

A workshop fixture inspection cell: The local file says pending, but Universal Robots UR5e may have continued

FelixBrown0893 · 31 points · Programming & support · 29 May 2026
21replies
F

How do I check whether this shipment left the seller? - loading inspection trays

FelixArcher0371 · 25 points · Buying robots from China · 23 May 2026
11replies