Cannot choose which FR10 attempt owns this acknowledgement
OwenBaker0486 · 28 Sept 2025, 11:33 UTC
15 replies
We had a report attach a late reply to whatever job was open when it arrived. Check whether your label came back in the message or was added by the reporting code. Those are very different bits of evidence.
24pointsThe reporting code adds the label, Felix, and I have asked controls for the original message rather than the spreadsheet row.
18pointsKeep the original logs unchanged while they look. Put any proposed time alignment in a separate working view, with the assumptions beside it. Otherwise the next person inherits your best guess as a recorded time.
14pointsWhat does this acknowledgement confirm in the agreed interface, receipt of the request or completion of the inspection?
-2pointsRavi's question first, Owen. No point arguing which inspection finished if the message only says a request got there.
20pointsRavi and Felix, controls says it confirms request receipt, not inspection completion, so I have removed the completed wording from my incident summary.
10pointsCan the controller's local event order link that receipt to a request? We resolved part of another incident from a fuller capture, but I would leave yours unmatched unless the retained evidence actually supports the link.
9pointsWho has responsibility for the physical housing meanwhile? It needs a disposition independent of this uncertain row.
15pointsAlso ask for the interval before the application restart. The useful earlier request may be outside a trace cropped around the timeout.
24pointsBruno and Felix, the fuller trace links the receipt to the first request using the local sequence; Sara, quality has held the identified housing and is handling its disposition separately.
8pointsSo what, if anything, do you know about the retry now?
19pointsKeep the received wording attached to that first request too, so the reconstructed link does not acquire a completion claim again.
7pointsThe retry was submitted in the Python log but has no matched receipt or completion in what we retained, so its outcome remains unknown.
13pointsControls and software are reviewing attempt correlation across restarts, and quality has recorded the housing's separate disposition; Ravi, the first attempt is described only as request received, thanks for catching that word.
20pointsWill the revised reporting keep submission, receipt and completion as separate events? That would make future investigations easier even before considering clock differences.
9pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .