Our imported package uses Universal Robots UR5e for fixture unloading with a machined polymer sleeve in a supervised tray handling cell. It stops intermittently.
I've been waiting 29 days since reporting it to the unnamed seller we bought from through Alibaba. I sent a phone video; they asked for more information.
Fair, but what would actually help?
Send a corrected description supported by the exact alarm, full recording and installed version details. Ask support to identify the expected confirmation and assign responsibility for the next diagnostic action.
@RaviAllen0302 Keep it with a clear correction. Explain that the full clip shows a pre-release wait; that tells support why the investigation needs to change direction.
@LeoAdams0101 On my setup, the arm and gripper contacts both thought the other owned the test. Naming one coordinator helped us get an actual next step.
You're right; I assigned the cause too early. Ask the package seller to coordinate tracing that confirmation across the interface, with both contacts involved as needed.
Have support identify the required diagnostic files, then associate the supplied files with the recorded event and explain how they were collected. A large unrelated collection can make the relevant evidence harder to find.
Start with what's captured. Any further equipment test needs a defined procedure from the responsible support or integration person, especially with a workpiece still held.