I reviewed a proposed FR5 unload layout with our setter. Empty gripper fits through the opening; nobody has drawn it holding the brass blank. Who normally supplies that complete path review before we accept a quotation?
What does the quotation actually assign to the integrator? If tooling and access validation are absent, get them included with a named deliverable. Otherwise everyone can assume someone else checked it.