The good bracket reading comes after a missing operation
VictorAllen0272 · 12 Jul 2025, 19:43 UTC
19 replies
Is it the same bracket revision? Easy to inherit the wrong history.
21pointsOld sheets and proposal both say revision G, so at least we're arguing about the same drawing this time.
13pointsAnd the fixture revision?
6pointsBefore you bury yourself in the folder, talk to whoever worked that bench. On ours the instruction said check and correct, but only check happened on every part. Some brackets never needed correction. Others visited twice. The final sheet made them all look like one simple operation because it only kept the accepted number. I wouldn't price every old bracket as rework, but I certainly wouldn't delete the checking bench from a layout on that evidence either. Did yours record visits or only final results?
9pointsOnly final results, Jo, and the fixture is J6 on both the setup sheet and its plate; I've asked the former operator how the checking and correction were split.
8pointsPrice the uncertainty. Leave an allowance for the missing work until the process review answers it. A blank estimate tends to become a promise of zero.
19pointsRebecca, would you put an allowance in both competing offers or ask each supplier to price it?
16pointsAsk both what they include. Keep your own allowance where neither has an agreed solution. Otherwise one offer wins by leaving the awkward line empty.
14pointsI'd also keep the bench footprint provisional. If inspection still happens there, removing the correction operation may not release all the space the drawing promises.
20pointsThanks, Rebecca. That makes the comparison easier to explain to purchasing.
23pointsFormer operator says each bracket was checked released, then corrected only if needed; no separate readings survived, but we've found the checking instruction and quality is reviewing it.
23pointsWhat does the instruction actually measure? Ours checked fit-up from a different datum than final inspection, which took an embarrassingly long time to notice. Same word square, two different checks.
17pointsThe released bracket angle from datum face A, same requirement as drawing G; quality confirmed that, but the clamped setup tick is only seating against the fixture stops.
19pointsSo are they planning to capture the released angle before any correction in the new trial?
5pointsYes, with identified parts and incoming fit-up recorded as well; welding and quality are writing the comparison, so I'm not carrying an unexplained bench tweak into the robot setup.
16pointsHas the estimate kept the allowance, Victor? The plan for a trial does not pay for whatever it discovers.
8pointsPlease share the result when that comparison happens. I'm interested whether the bench can go, not just whether the robot sequence fits the available floor.
11pointsAnd whether either supplier still looks cheaper with the same work included.
10pointsAllowance is still there, Rebecca, and both offers now list the inspection step; trial results are not back yet, so the bench space stays reserved rather than being counted as a saving.
8pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .