Evening-shift operator becoming a cell trainer

JoChan1114

Jo Chan

JC
GermanyJoined 25 Apr 202579 posts

About

Evening-shift operator becoming a cell trainer. Currently exploring grippers and tooling and fixtures. Working around an ageing control cabinet; planning a 13-week trial before making a decision.

Grippers and toolingFixtures

Conversations

Y

The FR10 may have finished while our result file stayed pending

YasminAdams0093 · 18 points · Programming & support · 4 Sept 2026
4replies
J

I taught the FR5 start sequence and left the awkward decisions with me

JoChan1114 · 8 points · Programming & support · 23 Aug 2026
0replies
L

our UR5e bracket review needs the condition before correction, not just the final pass

LeoChan1058 · 33 points · Applications & integration · 18 Aug 2026
4replies
J

Seller asked for the return but won't confirm receipt (Universal Robots UR5e, sorting small assembly pieces)

JamieChen1165 · 12 points · Buying robots from China · 11 Aug 2026
1replies
S

Which old measurements can actually guide our fixture review? - reviewing fixtures for welded mounting brackets

SarahBrown0937 · 35 points · Applications & integration · 5 Aug 2026
18replies
E

Final acceptance after correction still does not tell me the released bracket change

EllaBrown0903 · 30 points · Applications & integration · 31 Jul 2026
4replies
N

Sorting restart state before running 22 (Fairino FR10)

NinaArcher0414 · 19 points · Programming & support · 24 Jul 2026
10replies
J

Bracket final passes still hide which pieces went through correction

JoChan1114 · 24 points · Applications & integration · 8 Jul 2026
17replies
E

How do I hand over a welding study that only looked straight in restraint?

EdCarr · 23 points · Applications & integration · 28 Jun 2026
5replies
C

Returned UR5e interface module has delivery proof but no service intake

CarlaBrown0923 · 11 points · Buying robots from China · 13 Jun 2026
20replies
J

A small steel assemblies factory: a fabricated gusseted mounting bracket moves after release in our old inspection notes

JoChan1114 · 12 points · Applications & integration · 28 May 2026
1replies
Y

Handling two documented SDK response formats (Fairino FR10, controller availability reporting)

YasminCarter0963 · 28 points · Programming & support · 21 May 2026
10replies
V

What would explain the UR5e wait that my phone clip only shows?

VictorBrown0881 · 28 points · Buying robots from China · 6 May 2026
17replies
N

Universal Robots UR5e: One missing crate is hiding behind a completed consignment

NadiaAbbott0030 · 8 points · Buying robots from China · 20 Apr 2026
15replies
I

How do I hand over our FR10 empty-pocket decision without becoming the instruction sheet?

IsaacArcher0433 · 36 points · Programming & support · 15 Mar 2026
19replies
A

I cannot choose the FR5 stand from a tool-free doorway sketch

AdaBarnes0564 · 20 points · Fairino robots · 13 Mar 2026
15replies
F

Which bracket does this corrected pass actually belong to?

FelixBrooks0806 · 25 points · Applications & integration · 26 Feb 2026
4replies
N

Our FR10 cover references mix two polish finishes

NaomiBaker0506 · 15 points · Programming & support · 7 Feb 2026
1replies
Y

Which FR5 attempt owns this acknowledgement after a clock correction?

YasminChen1137 · 16 points · Programming & support · 7 Feb 2026
20replies
A

Why does our FR5 puck lean even with the tray correctly located?

AdaAbbott0042 · 38 points · General robotics · 3 Feb 2026
16replies