one panel sealed, stack transfer still untested

AmaraBell0687 · 18 Jul 2025, 17:41 UTC

Closed
AM
AmaraBell0687
Our UR5e panel tool sealed on a single sheet. I need the stack-to-nest trial now. What should we watch besides vacuum?

19 replies

HA
HassanBrown0878
Replying to AmaraBell0687

Was that single sheet supported on a bench during the seal test?

23 points
AM
AmaraBell0687
Replying to HassanBrown0878

Yes, flat on the bench. No lifted-panel view in the report.

19 points
AM
AmyAllen0293
Replying to AmaraBell0687

Then you haven't seen how the free edges behave. Ask for the actual supported span.

8 points
AM
AmaraBell0687
Replying to AmyAllen0293

Asked. The overhanging corners worry me more than the middle.

13 points
MA
MayaBrooks0823
Replying to AmaraBell0687

Watch the corners entering the nest too. A panel can hang clear and still catch the lip on placement.

22 points
AD
AdaAdams0129
Replying to AmaraBell0687

Are the panels stacked in the same surface condition used for the trial? Protective film, residue or moisture between sheets could change how they separate, so I would send a representative stack rather than loose selected panels.

2 points
AM
AmaraBell0687
Replying to AdaAdams0129

Production stack has interleaves. Test panel was supplied loose. Thanks, Ada, that's a missing bit.

7 points
NO
NoahArcher0368
Replying to AmaraBell0687

Our teaching example lifted a second thin sheet that nobody noticed until the placement went wrong. The vacuum indication looked entirely pleased with itself. I would ask the supplier how they detect or otherwise verify a single panel, and what the station does when that check is uncertain. It is much easier to discuss that before a double has reached the nest.

12 points
HA
HassanBrown0878
Replying to AmaraBell0687

How are the interleaves removed, Amara?

18 points
BR
BrunoChan1061
Replying to AmyAllen0293

And make the support arrangement part of the supplied tool definition, not a helper holding a corner for the video; maintenance needs to know which bits keep the panel shape under control.

9 points
MA
MayaBrooks0823
Replying to HassanBrown0878

I'd compare a manually prepared stack as well. Might be cheaper than automating interleaf handling for small runs.

20 points
AM
AmaraBell0687
Replying to HassanBrown0878

Operator removes each interleaf in the proposal. I hadn't included that time. We need both options costed.

13 points
AM
AmyAllen0293
Replying to MayaBrooks0823

Removing interleaves by hand doesn't answer whether two metal panels can travel together.

20 points
MA
MayaBrooks0823
Replying to AmyAllen0293

I didn't say it did. I'm questioning the extra interleaf equipment, not the single-panel check.

5 points
AD
AdaAdams0129
Replying to AmaraBell0687

Amara, does the proposed operator task occur at a separate preparation position, or beside the robot's pick location? That affects the workflow and the access arrangements the integrator needs to review.

2 points
NO
NoahArcher0368
Replying to MayaBrooks0823

Maya's cost comparison is sensible. I'd still insist both proposals use the same real stack conditions and the same acceptance checks, otherwise the cheaper one may simply leave more work to the operator.

22 points
AM
AmaraBell0687
Replying to AdaAdams0129

Separate preparation position. Integrator is reviewing the operator exchange. Supplier agreed to test corner support, separation and nest entry with our actual stack materials.

14 points
AM
AmaraBell0687
Replying to AmaraBell0687

First trial found a corner catching the nest lip. Single-panel verification worked in the tested cases. Tool support is being revised; no complete transfer acceptance yet.

11 points
BR
BrunoChan1061
Replying to AmaraBell0687

Will the revised support still leave access to replace the cups? Worth asking while the drawing is open, before a useful stiffener turns a routine change into dismantling half the tool.

8 points

Discussion closed