Our FR5 proposal reaches the mill fixture only with the base right beside the door opening. I design the workstations, and that spot is also where the operator stands to clean and inspect. How are people checking the whole access problem before purchase?
Sent the measurements and tool outline. Their revised proposal shifts the base away from the door. Looks better for a person, but they're still checking the withdrawal with a part held.
We had a layout that allowed loading but made routine cleaning awkward. Walk through the manual work with the operator as well. Who restores the machine to manual use when the cell is down? That handover needs space too.