Which restrained bracket check can be compared with our released acceptance?

SamAllen0333 · 27 Jul 2026, 04:45 UTC

Reply to discussion
SA
SamAllen0333
I have previously kept fixture cost separate from unresolved correction allowance. In this FR5 bracket review, the historical notes show alignment in restraint and failure after release. Before specifying a new study, how do I establish which checks describe fit-up, location or final acceptance? No live welding changes involved.

19 replies

KA
KaiChen1150
Replying to SamAllen0333

What did aligned actually mean in the old check: a gauge contact, measured dimension, or visual judgement?

3 points
SA
SamAllen0333
Replying to KaiChen1150

The sheet says gauge aligned. Final acceptance names a drawing dimension. I have not established that the gauge and inspection use the same reference surfaces.

10 points
GR
GraceBell0668
Replying to SamAllen0333

Find the gauge drawing if it exists. Otherwise aligned can sound much more specific than the evidence deserves.

4 points
CA
CalebAllen0319
Replying to GraceBell0668

Keep the gauge revision with the part revision. Both could have changed.

9 points
RO
RosaBaker0466
Replying to SamAllen0333

Ask what the correction stage costs to perform while you trace it. Your separate allowance still needs a basis, even if the old dimensions remain incomplete.

6 points
SA
SamAllen0333
Replying to GraceBell0668

The gauge drawing is retained and matches the sheet revision. It is a fit-up check, using different contacts from final inspection. I cannot treat the two entries as paired dimensional readings.

7 points
KA
KaiChen1150
Replying to SamAllen0333

Then the records don't measure movement on release in the way the shorthand suggests. They show two conditions assessed differently. What evidence actually says the first released assembly failed?

13 points
GR
GraceBell0668
Replying to KaiChen1150

Kai, Sam's opening does say failure after release. Are you questioning the failure or the possibility of calculating a change from the two checks?

22 points
KA
KaiChen1150
Replying to GraceBell0668

The latter, and whether the failed condition was recorded before correction. I phrased that poorly. A released failure can be real without making gauge aligned a comparable numerical starting point.

0 points
SA
SamAllen0333
Replying to KaiChen1150

There is a released failure note before correction, but no value against an individual assembly. We have a stage observation, not the paired readings needed to quantify the change.

9 points
CA
CalebAllen0319
Replying to SamAllen0333

That distinction should go into the new study brief explicitly.

6 points
RO
RosaBaker0466
Replying to SamAllen0333

And don't let the final pass after correction become the predicted first-pass yield in the cost sheet. That would remove the very uncertainty you're trying to measure.

5 points
SA
SamAllen0333
Replying to CalebAllen0319

Agreed. The proposal now distinguishes historical final acceptance from the as-released condition. Quality is defining a measurement method for incoming, located and released states on identified current assemblies.

1 points
GR
GraceBell0668
Replying to SamAllen0333

Will the new located measurement use the acceptance datums, or remain a process check? Either can be useful, but they need honest labels.

3 points
CA
CalebAllen0319
Replying to GraceBell0668

And defined supports for the released check. Merely unclamped is not a measurement method.

13 points
SA
SamAllen0333
Replying to GraceBell0668

Quality proposes a separate process check while located and a defined drawing-based released check. They are documenting why the results cannot simply be subtracted. The trial has not taken place.

23 points
RO
RosaBaker0466
Replying to SamAllen0333

Has someone been assigned to record correction time and whether it was needed for each assembly? That's how the allowance eventually becomes evidence instead of a permanent question mark.

12 points
KA
KaiChen1150
Replying to RosaBaker0466

Retain the uncorrected reading before that work, with its identity. Otherwise the new process will produce another fine set of corrected brackets and another missing comparison.

4 points
SA
SamAllen0333
Replying to GraceBell0668

Those records are assigned in the draft study plan. Thank you, Grace; checking the gauge drawing stopped me asking quality for a meaningless subtraction. Acceptance of the new fixture remains open pending the study.

7 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.