Toolroom machinist moving into robot fixtures

SamAllen0333

Sam Allen

SA
South East EnglandJoined 21 Oct 202572 posts

About

Toolroom machinist moving into robot fixtures. Currently exploring fixtures and buying robots from china. Working around a strict maintenance budget; planning a 2-week trial before making a decision.

FixturesBuying robots from China

Conversations

S

Which restrained bracket check can be compared with our released acceptance?

SamAllen0333 · 5 points · Applications & integration · 27 Jul 2026
19replies
S

Recovering part inspection bookkeeping across a crash

SamAllen0333 · 16 points · Programming & support · 20 Jul 2026
11replies
F

Fairino FR10: Our batch counter is counting retries as extra items

FionaAdams0151 · 16 points · Applications & integration · 19 Jul 2026
10replies
L

What should count as dimensional acceptance after welding? - defining dimensional control for bracket welding

LinChan1053 · 25 points · Applications & integration · 15 Jul 2026
8replies
F

Can I separate FR10 communication time from a slow diagnostic log write?

FionaAdams0151 · 17 points · Programming & support · 26 Jun 2026
10replies
S

Which old FR5 bracket findings justify a new traceable dimensional study?

SamAllen0333 · 18 points · Applications & integration · 19 Jun 2026
21replies
A

FR10 bracket records end with acceptance but omit the correction between

AnilBrooks0810 · 10 points · Applications & integration · 18 Jun 2026
17replies
D

Some bench samples rock in our locating nest - presenting mounting brackets for inspection

DineshAdams0125 · 11 points · Applications & integration · 6 Jun 2026
2replies
R

a gusseted angle-bracket assembly moves after release in our old inspection notes (Fairino FR5)

RaviAbbott0041 · 0 points · Applications & integration · 26 May 2026
12replies
C

The fixture holds nominal shape. What happens after release? (reviewing fixtures for welded mounting brackets)

ChloeAllen0309 · 39 points · Applications & integration · 19 May 2026
4replies
S

What should count as dimensional acceptance after welding? (Universal Robots UR5e)

SamAllen0333 · 28 points · Applications & integration · 5 May 2026
4replies
J

How do I compare sleeve seating before another UR5e pickup correction?

JaneChan1119 · 20 points · General robotics · 27 Mar 2026
14replies
L

How do I correct my FR5 review without pretending I disliked the trial?

LucyCarter1002 · 10 points · Reviews & comparisons · 20 Mar 2026
14replies
S

Can one person cover our UR5e bracket cell and the separate correction bench?

SamAllen0333 · 6 points · Applications & integration · 13 Feb 2026
13replies
R

Bracket correction copied into the FR10 route twice

RosaChan1075 · 28 points · Applications & integration · 8 Feb 2026
17replies
S

Which FR5 bracket result belongs to the fixture after its stop was moved?

SamAllen0333 · 34 points · Applications & integration · 31 Jan 2026
11replies
S

Why does our FR5 housing turn only after leaving the fixture support?

SamAllen0333 · 2 points · General robotics · 26 Jan 2026
16replies
Y

Which bracket measurement belongs before the correction entry?

YasminBaker0441 · 20 points · Applications & integration · 15 Jan 2026
10replies
O

Why call our FR10 locator fixed when the replacement tray still misses?

OwenAllen0312 · 2 points · Applications & integration · 2 Jan 2026
4replies
S

Which released-bracket measurement belongs in our fixture estimate?

SamAllen0333 · 19 points · Applications & integration · 8 Nov 2025
14replies