A reach sketch, at most. Ask for the complete held assembly through pickup, withdrawal, release and return against the measured machine. The door and its projecting parts belong in that model.
That connection needs a defined envelope before the complete-route check can settle selection. The integrator can compare proposed alternatives, but should name what is assumed for each.