Compare from the same incoming condition to the same finished-tray handover, with all preparation and clearing included; different tooling is fine if its work and limits are visible.
UR5e puck demo with a tray we do not receive
MayaChan1084 · 7 Jan 2026, 07:33 UTC
13 replies
UR5e supplier expects us to refill its dedicated tray first. Other offer starts from the incoming one.
0 pointsWho currently handles the pucks before that incoming tray reaches the station, Maya? I would include any preparation your present flow already needs, not give the baseline a free start.
8 pointsCould the dedicated tray replace the incoming tray earlier in the process, or would it definitely add a transfer? That might change whether its preparation is extra work or just moved work
14 pointsIncoming trays come from an outside process. We cannot change that supply. Dedicated tray means another transfer here.
17 pointsThen show that transfer and empty-tray clearing in the UR5e offer; I would still let it demonstrate the complete proposed route rather than reject it from the extra step alone.
14 pointsKeep the same puck variation and incoming condition in both demonstrations too, so neither gains a quiet advantage from a hand-picked set of easy samples.
25 pointsAnd involve the person who would do that re-traying in the comparison. The added work may be manageable, but the demo operator should not be the only person deciding that.
17 pointsOur operator is joining both trials. Same retained puck set and incoming-tray types agreed. Preparation is inside the timed boundary.
22 pointsWill you also count the stop to change product, Maya? A dedicated tray might make transfer clearer and still require more work whenever the next puck type arrives
19 pointsYes, changeover and clearing included. No free dedicated-tray refill hiding between timed runs.
7 pointsBoth complete trials finished. Both transferred the agreed pucks, but our operator's extra re-traying outweighed the UR5e option's faster handling. Other option had simpler changeovers too. We're comparing the final complete prices now.
4 pointsSelected the offer using our incoming trays. Whole-job cost and operator work fit us better. This comparison doesn't say one arm is generally better; the preparation difference decided this job.
14 pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .