Cannot sign off the FR5 pallet changeover with two layer diagrams
Morgan_Blair · 1 Nov 2025, 21:11 UTC
11 replies
Which difference affects the person changing it over? I would mark that on the two drawings first, especially if somebody has called the packaging change minor without showing what moved.
22pointsThe robot program matters too. A new operator diagram beside an old placement pattern would be a particularly unhelpful combination. Has the integrator actually received the packaging revision?
12pointsFarah, two cartons rotate differently. Lucy, integrator has it. Finger withdrawal review still uses the old one.
23pointsWho is issuing the combined revision?
15pointsWe had the old diagram survive in a laminated sheet after everyone updated their files. When this is settled, collect the old bench copies as well.
11pointsHenry, useful warning, but Morgan cannot replace them with an unresolved pattern either. I would mark the proposed changeover unavailable until the tool review catches up. Is the existing arrangement still the intended one for current work?
10pointsNo robot palletising in use yet. Manual packing continues. Integrator owns the combined issue, Rosa.
10pointsThen keep those two activities distinct in the handover. People packing manually need their valid instructions; the unapproved robot pattern should not quietly become the replacement because it looks newer.
1pointsDoes the manual method even use the proposed layer pattern?
0pointsDifferent pattern. New robot drawing now under joint review. Manual sheet stays. Thanks Henry for the laminated-copy warning.
12pointsGlad that part helps. Ours was tucked behind a cabinet door, which apparently made it immune to every document update we sent.
25pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .