Our FR5 bracket proposal copies an old fixture adjustment, although the records only show clamped alignment and loose-part failures. I'd like the missing measurement story understood before the adjustment becomes somebody else's standard method.
Keep the unknown reference beside the old result. A finished-part check defined from the current drawing will give quality a clearer starting point for the retained samples.
Ask about the component revisions too. My recent jig mystery included a different gusset, and I nearly copied the old fit-up aid into the new design before spotting that.
Is the correction work included anywhere in the proposed staffing or floor space? I would leave that open while you investigate, rather than let a missing record become zero work in the estimate.
No final readings yet. The inspector remembers a separate adjustment bench but not the details. Planning has left that work open, and tooling is checking the component revisions.
Current sample measurements are back: one misses the drawing height. The copied adjustment is still excluded. We need a defined process for this bracket, not a guessed explanation for the old one.
Have quality attach the measurement setup to those results. It will help the fixture review stay anchored to the current part while the historical questions remain open.