Latest discussions

Questions, experiences, and practical advice from the community.

Start a discussion
Started in

12,096discussions

D

Our imported handling package stops intermittently - fixture loading

DanielBennett0739 · 2 points · Buying robots from China · 31 Aug 2026
20replies
N

How do I trace a read-only connection to the intended controller? - controller availability checking

NinaAdams0153 · 26 points · Fairino robots · 31 Aug 2026
1replies
P

a steel gusseted bracket assembly moves after release in our old inspection notes

PriyaChan1090 · 38 points · Applications & integration · 31 Aug 2026
20replies
N

A supervised parts transfer bench: What should I report about this incomplete parts tray unloading improvement?

NadiaBaker0465 · 37 points · Applications & integration · 31 Aug 2026
16replies
E

A welded-bracket fabrication workshop: a steel gusseted bracket assembly moves after release in our old inspection notes

EllaBaker0468 · 7 points · Applications & integration · 31 Aug 2026
1replies
W

Manual inspection bench: The installed controller cooling filter is here; the spare isn't

WillBaker0487 · 11 points · Buying advice · 31 Aug 2026
11replies
E

Can saved responses make our offline testing useful? (Fairino FR10, inspection result parsing)

ElenaBarnes0601 · 38 points · Programming & support · 31 Aug 2026
8replies
T

The packing list includes the gripper mounting kit; the freight updates don't locate it (placing housings in trays)

ThomasAllen0277 · 14 points · Buying robots from China · 31 Aug 2026
13replies
S

Fairino FR10: stacking packed cartons onto dispatch pallets: what should matter besides how many boxes fit?

SofiaChan1065 · 20 points · Applications & integration · 31 Aug 2026
2replies
R

Fairino FR5 pickup drift: fixture, fingers or taught points? - tray unloading

ReeceBrooks0819 · 9 points · General robotics · 31 Aug 2026
1replies
F

Our imported handling package stops intermittently

FelixArcher0371 · 14 points · Buying robots from China · 31 Aug 2026
6replies
Z

A carton palletising project: Our carton has a preferred support direction. The pattern rotates it.

ZaraCarter1004 · 7 points · Applications & integration · 31 Aug 2026
14replies
H

The supplier says softer pads will help. How do I assess that? (planning gentle handling of cylindrical components)

HarishArcher0402 · 8 points · Buying advice · 31 Aug 2026
19replies
R

Fairino FR5: The packing list includes the gripper mounting kit; the freight updates don't locate it

RosaBennett0727 · 10 points · Buying robots from China · 31 Aug 2026
9replies
G

Same signal direction, different events (planning a lathe load-and-unload sequence)

GraceBaker0494 · 25 points · Programming & support · 31 Aug 2026
0replies
N

What proves delivery of the specific crate assigned to the teach pendant package? (placing samples in fixtures)

NadiaBaker0465 · 27 points · Buying robots from China · 31 Aug 2026
0replies
W

What should an offline review show for preparing a robotic bracket-welding concept?

WillAdams0139 · 30 points · Applications & integration · 31 Aug 2026
10replies
I

Finding the subprograms missing from our notes - inspection-cycle coordination

ImranAbbott0044 · 25 points · General robotics · 31 Aug 2026
19replies
L

Does our machine-tending layout actually fit the complete tool? (Fairino FR5)

LeoChan1058 · 3 points · Fairino robots · 31 Aug 2026
5replies
S

Is alternating the layers actually right for our cartons? (Universal Robots UR5e)

SaraBarnes0548 · 13 points · Applications & integration · 31 Aug 2026
4replies