Latest discussions

Questions, experiences, and practical advice from the community.

Start a discussion
Started in

12,104discussions

I

A robotic welding cell planning area: Our welding layout draws the torch as a line

ImranChen1175 · 26 points · Applications & integration · 25 Aug 2026
13replies
G

Can this alternating pattern support the load it arranges? (Fairino FR5, arranging shipping cartons in pallet layers)

GraceChen1190 · 37 points · Applications & integration · 25 Aug 2026
2replies
N

Planning for 44, judging from mismatched demos (Fairino FR10, sorted tray loading)

NinaBrown0936 · 37 points · Buying advice · 25 Aug 2026
12replies
D

Checking room for the tool holding a short steel blank (machine fixture unloading)

DineshAllen0299 · 35 points · Fairino robots · 25 Aug 2026
2replies
J

The CAD fit looks fine. Our samples disagree. (Fairino FR10, loading brackets into a locating nest)

JoAli0244 · 8 points · Applications & integration · 25 Aug 2026
5replies
C

How do I connect fixture location with released dimensions?

ChenBaker0442 · 11 points · Applications & integration · 25 Aug 2026
18replies
I

Our interface drawing agrees with itself until you read the notes (Fairino FR5, defining a lathe tending handshake)

ImranChen1175 · 28 points · Programming & support · 25 Aug 2026
18replies
M

Our open machine door is missing from the layout (Fairino FR5, machining fixture exchange)

MinaAllen0337 · 2 points · Fairino robots · 25 Aug 2026
1replies
D

Fairino FR5: How should I review support and separation for thin panels?

DineshBell0647 · 36 points · Applications & integration · 25 Aug 2026
9replies
N

Bright streaks move when we present the part differently - inspecting reflective surfaces for scratches

NoahBaker0455 · 17 points · Programming & support · 25 Aug 2026
21replies
V

What should packaging approve for stacking a labeled dispatch carton? - palletising sealed product cartons

VictorAbbott0011 · 33 points · Applications & integration · 25 Aug 2026
2replies
M

Which job owns the completion after reconnect? - fixture-check bookkeeping

MinaAbbott0076 · 11 points · Applications & integration · 25 Aug 2026
16replies
E

A cosmetic components workshop: How do I build a trustworthy reference set for a reflective aluminium bezel?

EmmaAllen0289 · 37 points · Programming & support · 25 Aug 2026
21replies
C

Our weldment looks aligned until it comes out of the fixture - preparing robotic welding of gusseted brackets

ChenChen1138 · 3 points · Applications & integration · 25 Aug 2026
21replies
C

How much work have I left out of handling a rigid connector housing? - tray loading

ClaraBrown0872 · 32 points · Buying advice · 25 Aug 2026
1replies
N

Arm received, FR5 controller and connection cable still only in a split-shipment claim

NinaAdams0153 · 23 points · Buying advice · 25 Aug 2026
4replies
H

How can our bezel reference teach the UR5e what finish to tolerate?

HassanAdams0095 · 31 points · Programming & support · 25 Aug 2026
10replies
R

Old high completion becomes another plate in our UR5e bookkeeping

ReeceBennett0732 · 37 points · Applications & integration · 25 Aug 2026
7replies
A

The unchanged FR10 status script reaches the network only on the old laptop

AmandaChambers · 9 points · Fairino robots · 25 Aug 2026
11replies
S

smooth demo board is not my taped UR5e carton batch

SofiaCarter0978 · 19 points · Applications & integration · 25 Aug 2026
11replies