Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,716discussions

Y

Can a sealing result support this panel-transfer decision? - planning single-panel vacuum transfers

YasminCarter0963 · 21 points · Applications & integration · 12 Jul 2026
17replies
N

Our weldment looks aligned until it comes out of the fixture (Fairino FR5)

NoahAllen0281 · 16 points · Applications & integration · 12 Jul 2026
1replies
L

A packaged-products warehouse: The layer pattern fits, but some cartons sit over gaps

LucyArcher0393 · 4 points · Applications & integration · 12 Jul 2026
16replies
A

How do I tie the installed insert to the right recipe? (Universal Robots UR5e)

AmaraAbbott0078 · 27 points · Applications & integration · 12 Jul 2026
0replies
G

The fixture holds nominal shape. What happens after release? (Fairino FR10)

GraceCarter1016 · 18 points · Applications & integration · 12 Jul 2026
0replies
N

How should I review support and separation for thin panels? (placing stacked sheet panels in an assembly fixture)

NoahAbbott0020 · 10 points · Applications & integration · 12 Jul 2026
15replies
H

Before we add restraint to a fixture we don't fully understand (Fairino FR10)

HassanAli0182 · 17 points · Applications & integration · 12 Jul 2026
1replies
R

Our application keeps missing a brief PLC request (Fairino FR10, part inspection)

RosaBaker0466 · 0 points · Applications & integration · 12 Jul 2026
0replies
J

Our weldment looks aligned until it comes out of the fixture

JoBell0679 · 21 points · Applications & integration · 11 Jul 2026
14replies
L

A packaged-products warehouse: Which drawings would connect carton support with gripper access?

LucyBennett0741 · 32 points · Applications & integration · 11 Jul 2026
12replies
L

Which drawings would connect carton support with gripper access? - planning alternating carton layers on a pallet

LucaBarnes0526 · 9 points · Applications & integration · 11 Jul 2026
3replies
J

Sample tray station: How do I compare delivered tooling with the agreed sample setup?

JackCarter1037 · 1 points · Applications & integration · 11 Jul 2026
10replies
M

What should count as dimensional acceptance after welding?

MinaAli0250 · 14 points · Applications & integration · 10 Jul 2026
1replies
O

Which old measurements can actually guide our fixture review? - defining dimensional control for bracket welding

OliverAli0189 · 19 points · Applications & integration · 10 Jul 2026
10replies
K

Universal Robots UR5e: What should I ask after an unconfirmed gripper-kit substitution?

KaiBaker0454 · 38 points · Applications & integration · 10 Jul 2026
4replies
G

Before I sign off a pallet drawing full of neat rectangles

GabrielBarnes0540 · 20 points · Applications & integration · 10 Jul 2026
5replies
C

A low-volume order packing area: Our 194 starting batch doesn't answer the maintenance question

ChenBarnes0529 · 30 points · Applications & integration · 10 Jul 2026
8replies
W

Would a stronger clamp hide a locating problem? (Fairino FR10)

WillBaker0487 · 21 points · Applications & integration · 10 Jul 2026
4replies
L

Separating fit-up, restraint and final inspection - defining dimensional control for bracket welding

LeahAllen0321 · 17 points · Applications & integration · 10 Jul 2026
1replies
H

A packaged-products warehouse: Can this alternating pattern support the load it arranges?

HenryChen1134 · 26 points · Applications & integration · 10 Jul 2026
0replies