Production planner for short-batch assembly

ChenAdams0094

Chen Adams

CA
GermanyJoined 16 Jan 2025108 posts

About

Production planner for short-batch assembly. Currently exploring grippers and tooling and supplier support. Working around inconsistent part presentation; planning a 9-week trial before making a decision.

Grippers and toolingSupplier support

Conversations

E

Where should a software mock stop? (Universal Robots UR5e, fixture status interpretation)

ElenaBarnes0601 · 16 points · Programming & support · 1 Sept 2026
18replies
J

The bracket acceptance pack mixes fit-up notes with released inspection

JoBrooks0853 · 7 points · Applications & integration · 23 Aug 2026
14replies
V

The FR10 arrived, but its extra pendant cable has no supply date

VictoriaChambers · 34 points · Buying advice · 19 Aug 2026
15replies
S

the brass blank reaches the fixture only in an incomplete FR5 drawing

StephanieChambers · 30 points · Fairino robots · 17 Aug 2026
20replies
S

I do not want the new welding cell inheriting a correction nobody can explain

SarahCarter1024 · 37 points · Applications & integration · 16 Aug 2026
9replies
R

Reconciling retained job state without resending work (Universal Robots UR5e, inspection completion tracking)

RobinAdams0164 · 21 points · Applications & integration · 13 Aug 2026
15replies
C

Our UR5e spacer grip is less square despite all the pickup edits

Colin_Casey · 13 points · General robotics · 29 Jul 2026
4replies
N

Which event details are missing from my FR5 sleeve-unloading video?

NathanAli0199 · 23 points · Buying robots from China · 26 Jul 2026
16replies
N

A compact prototype production area: Intermittent stops while handling an aluminum spacer block: what should I capture?

NinaBaker0501 · 33 points · Buying robots from China · 23 Jul 2026
16replies
C

Our FR10 connector housing is damaged beside a shifted crate support

ChenAdams0094 · 3 points · Buying robots from China · 5 Jul 2026
5replies
C

Forty-six days into our FR5 stop report and the video still lacks the message

ChenAdams0094 · 10 points · Buying robots from China · 12 Jun 2026
2replies
L

I can't plan around an FR5 fault ticket that says only intermittent stop

LeahChan1104 · 6 points · Buying robots from China · 12 Jun 2026
21replies
J

Intermittent stops while handling a molded connector body: what should I capture? (fixture unloading)

JaneAllen0336 · 29 points · Buying robots from China · 5 Jun 2026
16replies
A

Bought against a drawing; received a different-looking interface (transferring small fixture plates)

AlexArcher0385 · 17 points · Buying advice · 27 May 2026
14replies
C

Turning a vague fault report into a useful support request (Fairino FR10, tray unloading)

ChenAdams0094 · 17 points · Buying robots from China · 20 May 2026
2replies
C

Fairino FR5: How do I check access for machine fixture loading?

ClaraCarter0959 · 21 points · Fairino robots · 18 May 2026
1replies
I

What counts as a confirmed defect on a reflective surface? (Fairino FR5, planning camera inspection of reflective parts)

ImranBarnes0566 · 23 points · Programming & support · 15 May 2026
10replies
C

The fixture holds nominal shape. What happens after release?

ChenAdams0094 · 28 points · Applications & integration · 14 May 2026
18replies
C

The FR10 handover shows a routine but not what it depends on

ChenAdams0094 · 15 points · General robotics · 6 May 2026
4replies
B

Why does our offline retry test accept the wrong result? - inspection result reconciliation

BrunoAdams0104 · 11 points · Programming & support · 18 Apr 2026
19replies