Research laboratory equipment coordinator

GraceBrown0929

Grace Brown

GB
South East EnglandJoined22 Mar 202658posts

About

Research laboratory equipment coordinator. Currently exploring fixtures and robot comparisons. Working around remote technical support; planning a 12-week trial before making a decision.

FixturesRobot comparisons

Conversations

G

A robotic welding project review: The fixture holds nominal shape. What happens after release?

GraceBrown0929 · 10 points · Applications & integration · 28 Aug 2026
2replies
G

The fixture holds nominal shape. What happens after release? (reviewing fixtures for welded mounting brackets)

GraceBrown0929 · 19 points · Applications & integration · 26 Aug 2026
20replies
G

Which incoming bracket records belong with the restrained alignment note?

GraceBrown0929 · 16 points · Applications & integration · 21 Aug 2026
8replies
G

I cannot carry an unexplained bracket correction into the UR5e estimate

GraceBrown0929 · 17 points · Applications & integration · 18 Aug 2026
1replies
G

The FR5 sampling screen slows down when I ask it to tell me more

GraceBrown0929 · 33 points · Programming & support · 31 Jul 2026
17replies
G

I need the released bracket measurements before adopting a correction routine

GraceBrown0929 · 7 points · Applications & integration · 29 Jul 2026
1replies
N

Our weldment looks aligned until it comes out of the fixture (Fairino FR5)

NoahAllen0281 · 16 points · Applications & integration · 12 Jul 2026
1replies
G

I cannot tell what our FR10 bracket correction changed from the final sheet

GraceBrown0929 · 20 points · Applications & integration · 20 Jun 2026
0replies
G

Cannot arrange UR5e receiving from twenty-one days of label created

GraceBrown0929 · 25 points · Buying robots from China · 17 Jun 2026
2replies
O

UR5e bracket estimate with a correction nobody has described

OscarAbbott0010 · 31 points · Applications & integration · 17 Jun 2026
12replies
G

Fairino FR10: Separating fit-up, restraint and final inspection

GraceBrown0929 · 27 points · Applications & integration · 2 Jun 2026
17replies
A

reviewing fixtures for welded mounting brackets: held straight and finished straight aren't the same check

AaronAdams0088 · 25 points · Applications & integration · 29 May 2026
3replies
I

Which old measurements can actually guide our fixture review? (reviewing fixtures for welded mounting brackets)

IsaacCarter1042 · 8 points · Applications & integration · 26 May 2026
21replies
G

Fairino FR5: Reproducing delayed events without random sleeps

GraceBrown0929 · 32 points · Programming & support · 8 May 2026
2replies
G

Which old measurements can actually guide our fixture review? (Universal Robots UR5e)

GraceBrown0929 · 11 points · Applications & integration · 30 Apr 2026
9replies
G

I cannot compare the FR5 bracket proposals while both omit the torch body

GraceBrown0929 · 21 points · Applications & integration · 28 Apr 2026
0replies
C

Why does our FR10 bracket summary pair a failure with somebody else's pass?

CarlaChen1184 · 18 points · Applications & integration · 13 Apr 2026
8replies
G

a gusseted steel support bracket weldment moves after release in our old inspection notes (Fairino FR10)

GraceBrown0929 · 8 points · Applications & integration · 30 Mar 2026
12replies
A

Why does our FR10 bracket estimate charge a correction that looks like planned machining?

AaronAdams0088 · 26 points · Applications & integration · 23 Mar 2026
19replies
G

I cannot divide our blank-length variation from the loading variation

GraceBrown0929 · 12 points · Applications & integration · 23 Mar 2026
4replies