Production planner for short-batch assembly

LouisChan1094

Louis Chan

LC
WalesJoined 4 Mar 202676 posts

About

Production planner for short-batch assembly. Currently exploring spare parts and buying robots from china. Working around tight tooling clearance; planning a 3-week trial before making a decision.

Spare partsBuying robots from China

Conversations

A

The CAD fit looks fine. Our samples disagree. (Fairino FR10, presenting mounting brackets for inspection)

AmyCarter0989 · 23 points · Applications & integration · 30 Aug 2026
3replies
L

How do I judge the FR10 pouch process when every product adds preparation work?

LouisChan1094 · 13 points · Applications & integration · 18 Aug 2026
0replies
L

Fairino FR10: The fixture holds nominal shape. What happens after release?

LouisChan1094 · 27 points · Applications & integration · 10 Aug 2026
10replies
L

Fairino FR10: Enough reach, incomplete drawing

LouisChan1094 · 19 points · Fairino robots · 10 Aug 2026
16replies
L

Fairino FR5: Are we teaching our camera to reject reflections?

LinAllen0270 · 27 points · Programming & support · 25 Jul 2026
7replies
R

The scratch labels look less certain than the images suggest

RachelChan1131 · 7 points · Programming & support · 23 Jul 2026
20replies
L

Fairino FR10: The reach sketch leaves out our machine door and gripper

LouisChan1094 · 35 points · Fairino robots · 22 Jul 2026
21replies
L

A small machined-components factory: Softer pads for a finished metal collar, or a better comparison first?

LouisChan1094 · 16 points · Buying advice · 20 Jul 2026
21replies
B

How do I make event-order bugs repeatable? (Fairino FR10, inspection-cycle tracking)

BethBaker0498 · 11 points · Programming & support · 12 Jul 2026
9replies
L

Bought against a drawing; received a different-looking interface (Fairino FR5, placing molded parts in nests)

LouisChan1094 · 34 points · Buying advice · 9 Jul 2026
20replies
H

How do I stop our FR5 monitor counting an old retained completion as another housing?

HassanAllen0269 · 38 points · Applications & integration · 27 Jun 2026
13replies
L

How many times can a UR5e shipment be delivered without its tooling crate?

LouisAbbott0050 · 24 points · Buying robots from China · 24 Jun 2026
11replies
A

FR10 bracket history skips the explanation between release and acceptance

AnnaChen1199 · 40 points · Applications & integration · 16 Jun 2026
9replies
B

How do I reconcile the coupon completion that our UR5e monitor rereads?

BethAbbott0063 · 34 points · Applications & integration · 14 Jun 2026
4replies
O

Cannot agree our UR5e pilot while fixture labour is a guess

OscarBarnes0532 · 22 points · Buying advice · 10 Jun 2026
20replies
E

One crate arrived; the rest of the order has no tracking (placing assembly inserts)

ElenaBell0688 · 26 points · Buying advice · 4 Jun 2026
18replies
C

What should I do with costs nobody can price yet? - carton insert loading

CallumBell0621 · 12 points · Buying advice · 3 Jun 2026
4replies
L

How do I compare FR10 cover lighting when the quiet picture also loses the scratch?

LinAdams0096 · 16 points · Programming & support · 30 Apr 2026
20replies
L

Why does every empty FR10 tray pocket still require me?

LouisChan1094 · 36 points · Programming & support · 22 Apr 2026
13replies
L

Why is our UR5e sample demonstration filmed without the receiving tray?

LouisChan1094 · 33 points · Buying advice · 1 Apr 2026
7replies