Research software developer entering industrial integration

NinaBell0675

Nina Bell

NB
South West EnglandJoined 23 Feb 202629 posts

About

Research software developer entering industrial integration. Currently exploring grippers and tooling and maintenance. Working around limited floor space; planning a 3-week trial before making a decision.

Grippers and toolingMaintenance

Conversations

J

Closing a missing accessory issue without overstating it (transferring small housings)

JuliaBennett0761 · 31 points · Buying advice · 1 Sept 2026
19replies
S

The timestamps don't tell the whole story (Universal Robots UR5e, part acceptance recording)

SarahAbbott0067 · 7 points · Programming & support · 8 Aug 2026
18replies
N

How do I count 136 accepted housings without counting every FR5 retry?

NinaBell0675 · 27 points · Applications & integration · 27 Jul 2026
9replies
N

I don't want another coordinate tweak to be our maintenance plan - fixture-to-tray transfer

NinaBell0675 · 33 points · General robotics · 11 Jul 2026
6replies
N

The listing says inspected. I need something more useful. (fixture-to-tray transfer)

NinaBell0675 · 7 points · Buying advice · 26 May 2026
14replies
H

The video arrived, but the agreed observations are still missing (loading small inspection fixtures)

HanaBrooks0796 · 25 points · Buying advice · 16 May 2026
11replies
N

How do I find what turns our UR5e spacer block before another point change?

NinaBell0675 · 15 points · General robotics · 8 Apr 2026
3replies
N

The tray looks fixed, but the grip looks crooked (Universal Robots UR5e, tray loading)

NinaBell0675 · 23 points · General robotics · 7 Apr 2026
0replies
N

What are our FR5 spacer offsets hiding at the grip?

NinaBell0675 · 26 points · General robotics · 5 Apr 2026
2replies
B

fifty-four days of a spare cable joining no shipment

BethArcher0411 · 3 points · Buying advice · 6 Mar 2026
6replies
N

How do I get an answer about the spare pendant cable I paid for?

NinaBell0675 · 24 points · Buying advice · 25 Feb 2026
1replies