Equipment reuse and repair coordinator

TobyBarnes0579

Toby Barnes

TB
South West EnglandJoined 13 Aug 202646 posts

About

Equipment reuse and repair coordinator. Currently exploring plc integration and workshop projects. Working around a restricted weekend trial window; planning a 16-week trial before making a decision.

PLC integrationWorkshop projects

Conversations

T

How do I compare delivered tooling with the agreed sample setup? (Fairino FR10, loading lightweight inspection pieces)

TobyBarnes0579 · 16 points · Applications & integration · 1 Sept 2026
0replies
T

Handling a rigid molded housing more consistently, except after that tray replacement (tray-to-fixture transfer)

TobyBarnes0579 · 12 points · Applications & integration · 31 Aug 2026
13replies
T

Am I asking too much by wanting an identifiable demonstration? (loading small inspection fixtures)

TobyBarnes0579 · 32 points · Buying advice · 30 Aug 2026
12replies
A

The guide for my Fairino FR10 doesn't match the connections (loading empty assembly fixtures)

AnnaBrown0938 · 26 points · Buying robots from China · 30 Aug 2026
1replies
T

Our example images keep turning shiny patches into defects - checking cosmetic metal surfaces with a fixed camera

TobyBarnes0579 · 28 points · Programming & support · 30 Aug 2026
0replies
T

Prepared handling station: Our Universal Robots UR5e arm arrived; the crate for the controller package didn't

TobyBarnes0579 · 36 points · Buying robots from China · 30 Aug 2026
11replies
T

Small production workshop: Trying to trace Universal Robots UR5e through a disputed handover

TobyBarnes0579 · 8 points · Buying robots from China · 29 Aug 2026
11replies
T

Is the wrong guide enough to explain these connection differences? (Fairino FR10, positioning test pieces on a bench)

TobyBarnes0579 · 35 points · Buying robots from China · 28 Aug 2026
0replies
T

A compact contract manufacturing shop: Turning an incomplete robot estimate into a useful decision

TobyBarnes0579 · 11 points · Buying advice · 26 Aug 2026
4replies
T

FR10 handover pictures show a main routine and hide everything it calls

TobyBarnes0579 · 7 points · General robotics · 24 Aug 2026
5replies
H

Retained completion attached to the next housing

HarishAli0228 · 11 points · Applications & integration · 24 Aug 2026
17replies
T

Forty-seven days and the supplied FR10 guide still depicts a different panel

TobyBarnes0579 · 20 points · Buying robots from China · 23 Aug 2026
21replies
T

Nine days asking to see the UR5e finger set do our agreed task

TobyBarnes0579 · 24 points · Buying advice · 15 Aug 2026
11replies
T

the offline FR5 screen is happy because the mock agrees with everything

TobyBarnes0579 · 25 points · Programming & support · 15 Aug 2026
19replies