Packaging changeover operator

YasminCarter0963

Yasmin Carter

YC
South East EnglandJoined 15 Feb 202670 posts

About

Packaging changeover operator. Currently exploring grippers and tooling and small-batch automation. Working around remote technical support; planning a 19-week trial before making a decision.

Grippers and toolingSmall-batch automation

Conversations

F

A dispatch packaging area: What evidence do I need for picking a taped corrugated box?

FarahChen1200 · 16 points · Applications & integration · 4 Sept 2026
20replies
N

Where do I start with inconsistent chuck seating? (loading cylindrical blanks into a lathe chuck)

NinaAdams0153 · 35 points · Applications & integration · 3 Sept 2026
10replies
E

Different exposed lengths without the blank dimensions beside them

ElenaBarnes0601 · 10 points · Applications & integration · 18 Aug 2026
20replies
C

What should I report about this incomplete tray-to-fixture transfer improvement? (Fairino FR10)

CalebBarnes0580 · 28 points · Applications & integration · 11 Aug 2026
10replies
F

The log folder gets busy and our display stops (status trend recording)

FarahChen1200 · 23 points · Programming & support · 8 Aug 2026
3replies
Y

matching UR5e labels haven't explained the arm-cable guide mismatch

YasminCarter0963 · 32 points · Buying robots from China · 29 Jul 2026
0replies
N

Our FR5 mode screen gives an error response a believable number

NinaChen1197 · 11 points · Programming & support · 28 Jul 2026
19replies
P

Long fingers, an adapter, and a quote based on part mass (Fairino FR10, loading metal housings into inspection nests)

PriyaAdams0133 · 18 points · Buying advice · 13 Jul 2026
8replies
Y

Can a sealing result support this panel-transfer decision? - planning single-panel vacuum transfers

YasminCarter0963 · 21 points · Applications & integration · 12 Jul 2026
17replies
Y

fr10 locator looked better until the source tray was replaced

YasminCarter0963 · 13 points · Applications & integration · 8 Jul 2026
2replies
E

Cannot assign our FR5 housing acknowledgement after the job name was reused

EllaCarter0990 · 20 points · Programming & support · 14 Jun 2026
19replies
J

Steel bush projection varies before the FR5 loads anything

John_Campbell · 35 points · Applications & integration · 10 Jun 2026
11replies
Y

A low-volume CNC workshop: One dimension on the sheet, more than one possible cause

YasminCarter0963 · 10 points · Applications & integration · 25 May 2026
13replies
Y

Prepared handling station: Does the master shipment status cover every crate?

YasminCarter0963 · 25 points · Buying robots from China · 23 May 2026
3replies
Y

Handling two documented SDK response formats (Fairino FR10, controller availability reporting)

YasminCarter0963 · 28 points · Programming & support · 21 May 2026
10replies
Y

A supervised assembly training cell: How do I help operators with an interrupted tray transfer job?

YasminCarter0963 · 38 points · Programming & support · 19 May 2026
6replies
Y

Sealed box, incomplete kits, disputed quantity - repeating lightweight fixture loading jobs

YasminCarter0963 · 37 points · Buying advice · 19 May 2026
7replies
Y

rebuilt laptop rejects the fr5 query before connecting

YasminCarter0963 · 8 points · Fairino robots · 7 Apr 2026
10replies
Y

the pouch transfer is quick, my preparation isn't

YasminCarter0963 · 10 points · Applications & integration · 14 Mar 2026
10replies
Y

our ur5e test only catches the old completion when the laptop is feeling slow

YasminCarter0963 · 33 points · Programming & support · 11 Mar 2026
11replies