our connector pause has three tray names

AmaraBell0687 · 10 Sept 2025, 12:58 UTC

Closed
AM
AmaraBell0687
FR10 connector loading pauses after a tray change. Our support clips say tray one, new tray and outlet. Same place, apparently. What should I send?

11 replies

EL
ElenaBrown0949
Replying to AmaraBell0687

Start with the physical tray station and its identifier, then one occurrence with the readable message, active step and time. We had to separate two fixture revisions in another report; the casual tray names were hiding the difference.

14 points
AM
AmaraBell0687
Replying to ElenaBrown0949

Receiving station R2. Message says tray not confirmed. I can get the matching log interval.

9 points
EL
ElenaBrown0949
Replying to AmaraBell0687

Ask support which confirmation that step expects at R2, with the relevant ordinary input state for the same occurrence. The message alone doesn't tell you whether it means identity, seating or an empty receiving location.

5 points
AM
AmaraBell0687
Replying to ElenaBrown0949

They say fixture seated confirmation. Maintenance is comparing the target arrangement with R2's drawing.

16 points
MA
MayaChen1171
Replying to AmaraBell0687

Which drawing revision? Get that into the ticket before someone compares the old target position again.

10 points
AL
AlexAdams0124
Replying to AmaraBell0687

Any result from the target comparison, Amara?

11 points
AM
AmaraBell0687
Replying to MayaChen1171

Maya, R2 revision E. Alex, fitted target differs from E; tooling is reviewing why. No repair yet.

5 points
WI
WillCarter1009
Replying to AmaraBell0687

Does the other changeover fixture use the same revision? Useful to check before the report starts treating every tray change as one case.

6 points
AM
AmaraBell0687
Replying to WillCarter1009

Other fixture is D. We've separated its occurrences. Thanks, Will; the shared station name hid that.

3 points
EL
ElenaBrown0949
Replying to AmaraBell0687

Keep R2 as the station name and add the installed fixture ID beside each occurrence. You need both, otherwise fixing the ambiguous tray names just replaces one missing detail with another.

10 points
MA
MayaChen1171
Replying to AmaraBell0687

Has tooling confirmed the intended target arrangement for E? That still needs answering before the mismatch becomes a repair instruction.

22 points