What was actually checked under restraint, Ada? I would establish whether that note is visual alignment or a measurement of the drawing requirement before comparing it with the released result. The word aligned can conceal quite a lot of optimism.
Can inspection identify the support arrangement and drawing revision from the linked assembly records? Without those, the released values may not be comparable with final acceptance.
Use the linked records to identify missing stages for a new study, then. Keep the restrained observation, released values and corrected final result distinct. The welding and inspection owners should define the next comparison rather than let an unexplained batch note become the new cell's process instruction.