Ninety-eight FR10 checks, eighty-two housings

FelixAli0197 · 1 Jan 2026, 16:32 UTC

Closed
FE
FelixAli0197
I took the dashboard total to the bench and found sixteen more checks than housings. Reviewed retries explain them. They do not explain why the FR10 report calls all ninety-eight finished parts. We have item identities and disposition records. I want the accepted count corrected without erasing the failed attempts that tell us how much work this batch actually took.

11 replies

SA
SarahBrooks0850
Replying to FelixAli0197

Can each of those attempts be linked to one housing identity, including the records restored after restart?

18 points
LI
LiamAli0229
Replying to FelixAli0197

Keep attempt workload as a separate measure. It is useful for planning, just not as the number of physical housings accepted. No need to throw away the busy part of the story.

14 points
BR
BrunoArcher0365
Replying to FelixAli0197

Does the headline total also appear in the exported report? A corrected screen would be a rather small victory if purchasing still receives the old number.

9 points
FE
FelixAli0197
Replying to SarahBrooks0850

Sarah, yes, all ninety-eight link to eighty-two housings. Bruno, export repeats the same inflated count. Current dispositions are seventy-six accepted, four held and two rejected, which is less exciting but actually adds up.

-3 points
NI
NinaAllen0327
Replying to FelixAli0197

Show held and rejected separately; whoever arranges the next work needs different answers for those two groups

8 points
SA
SarahBrooks0850
Replying to FelixAli0197

Use the current authorised disposition for each identified housing, with its attempts retained beneath it; then repeated delivery of a result should not produce another accepted housing.

6 points
LI
LiamAli0229
Replying to SarahBrooks0850

And test a later change of disposition. I mean an authorised change, not a software guess. The count needs to reflect it without deleting why the earlier decision was made.

9 points
BR
BrunoArcher0365
Replying to LiamAli0229

Try reopening the application after that change as well. Otherwise the old accepted total may be waiting patiently to return from storage.

4 points
FE
FelixAli0197
Replying to BrunoArcher0365

The revised offline report shows the three disposition groups and the separate ninety-eight attempts. Duplicate delivery leaves the item totals alone. Later disposition changes and restart are still on the maintainer's test list.

13 points
NI
NinaAllen0327
Replying to FelixAli0197

Who signs off the item list behind those totals?

17 points
FE
FelixAli0197
Replying to NinaAllen0327

Quality owns that comparison against the disposition records. I have sent the actual housing list, not just the three numbers. Until they check it and the remaining tests pass, this is a test report.

16 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .