Mobile-robot fleet coordinator

SarahBrooks0850

Sarah Brooks

SB
GermanyJoined 28 Jul 2025166 posts

About

Mobile-robot fleet coordinator. Currently exploring workshop projects and python sdks. Working around no spare production machine; planning a 17-week trial before making a decision.

Workshop projectsPython SDKs

Conversations

N

Where is the second shipment for our UR5e?

NadiaBell0639 · 26 points · Buying advice · 4 Sept 2026
7replies
R

ready went high before the lathe finished preparing

RebeccaBell0691 · 5 points · Programming & support · 4 Sept 2026
10replies
L

Our retry bookkeeping needs a tougher offline test (Fairino FR10, sample acceptance bookkeeping)

LouisBaker0485 · 31 points · Programming & support · 2 Sept 2026
1replies
S

Universal Robots UR5e: How do I keep an uncertain attempt out of automatic resubmission?

SofiaAdams0108 · 16 points · Programming & support · 27 Aug 2026
16replies
E

A compact prototype production area: Support asked for more information. Which information?

ElliotBrooks0857 · 39 points · Buying robots from China · 27 Aug 2026
1replies
T

the FR5 carton pattern needs the filled-box support drawn under it

ThomasAbbott0016 · 18 points · Applications & integration · 24 Aug 2026
21replies
M

Forty-five days of FR10 demo requests and I still cannot see the ordered pads working

MinaBennett0772 · 22 points · Buying advice · 19 Aug 2026
10replies
S

Thirty-nine days of label created for the UR5e tray-gripper order

SarahBrooks0850 · 35 points · Buying robots from China · 18 Aug 2026
1replies
R

Why does my FR5 restart helper retry a request whose outcome is unknown?

RobinBell0686 · 18 points · Programming & support · 16 Aug 2026
7replies
T

Fairino FR10: Is alternating the layers actually right for our cartons?

TheoCarter1019 · 2 points · Applications & integration · 11 Aug 2026
7replies
O

Manual sorting bench: Our grouping lightweight test pieces setup is waiting on an unconfirmed dispatch

OliverBaker0450 · 12 points · Buying robots from China · 11 Aug 2026
15replies
E

Separating fit-up, restraint and final inspection (Fairino FR10, defining dimensional control for bracket welding)

EllaChan1077 · 24 points · Applications & integration · 7 Aug 2026
20replies
M

What does inspected cover on this tempting refurbished FR10?

MeiBarnes0603 · 32 points · Buying advice · 27 Jul 2026
10replies
A

How do I make event-order bugs repeatable? (Fairino FR10, inspection result reconciliation)

AaronBennett0697 · 29 points · Programming & support · 4 Jun 2026
6replies
S

The supplied the tool interface bracket interface doesn't match our fixture drawing (Fairino FR5)

SarahBrooks0850 · 13 points · Buying advice · 4 Jun 2026
9replies
S

Which geometry is missing from this welding-cell proposal? (reviewing torch access for fabricated brackets)

SarahBrooks0850 · 8 points · Applications & integration · 21 May 2026
0replies
G

Bright streaks move when we present the part differently (Universal Robots UR5e)

GraceBell0668 · 32 points · Programming & support · 14 May 2026
21replies
E

I can see a timeout but can't match the acknowledgement (Fairino FR10)

ElenaBennett0775 · 32 points · Programming & support · 13 May 2026
4replies
A

Our Fairino FR5 completion tracking forgets what it already saw

AlexChan1081 · 15 points · Applications & integration · 10 May 2026
2replies
J

FR5 faceplate labels attached to a moving streak

JoCarter1027 · 2 points · Programming & support · 7 May 2026
11replies