I need the seller to look at the loading wait, not the tray-unloading title somebody put on our ticket. The UR5e holds a connector above the fixture and waits. Fourteen days since I reported it through our Alibaba seller contact, and my video still hasn't answered their questions. What should accompany it?
Rachel, does the seller use your connector name or another part reference? Our unloading enquiry lost time matching a workshop nickname to their paperwork.
Leah, different name. I've supplied the drawing reference with our nickname beside it. Tooling identified the fitted insert as the correct family but an older revision than the seller's setup image.
The technical contact found the difference: their presence target position was revised with the insert, but our delivered set mixes the earlier insert and later target arrangement. Tooling is checking the matching replacement proposal.
Keep that proposed matching set identified as a complete arrangement. A replacement insert by itself may leave the same mismatch if another piece is assumed.
Has the seller acknowledged which arrangement was supplied against the order? Useful to get that settled before the next dispatch photo arrives with yet another reference.