fr5 connector ticket has the step but not the receiving insert

JamieChan1078 · 29 Oct 2025, 09:28 UTC

Closed
JA
JamieChan1078
Our sleeve report now asks about a specific confirmation; on this separate connector-unloading ticket I have the readable step and message too, but the clip hides the receiving insert, so I cannot assume the current setup sheet describes that occurrence.

5 replies

SA
SarahBrooks0850
Replying to JamieChan1078

We found an operator's changeover note useful for that gap; is the person who fitted the receiving insert available, with the original clip time rather than its forwarding time?

14 points
JA
JamieChan1078
Replying to SarahBrooks0850

Setter identified the insert from the changeover note, but its marking only names the carrier; tooling is comparing the physical insert with the drawing before we attach a confident reference.

13 points
SA
SarahBrooks0850
Replying to JamieChan1078

Did tooling complete that comparison, Jamie, or is the ticket still waiting on the insert identity?

15 points
JA
JamieChan1078
Replying to SarahBrooks0850

They matched it to drawing E and confirmed it belongs to this connector job; sent that with the occurrence and program version, asking which receiving confirmation the recorded step uses.

8 points
SA
SarahBrooks0850
Replying to JamieChan1078

Useful to close that gap; keep the carrier and removable insert distinct in the handover too, so the next changeover does not recreate the same uncertain name.

12 points