Why does reconnect give our FR10 coupon another completion?

CallumBennett0708 · 28 Jun 2026, 10:51 UTC

Reply to discussion
CA
CallumBennett0708
Our commissioning monitor counts a retained completion again after reconnect, so the sample-verification total gains a coupon without any new work; I need that signal tied back to its job, not cleared or used as an excuse to resubmit anything, and I need a handover someone other than me can use

18 replies

CH
ChenChan1051
Replying to CallumBennett0708

Does the reconnect record contain a job identity, or only the completion bit?

23 points
FI
FionaBell0673
Replying to CallumBennett0708

I'd preserve the raw reread separately from the counted result. You can observe the same completion twice without producing two completed jobs; throwing away the reread makes the diagnostic history less useful.

14 points
LO
LouisBennett0746
Replying to FionaBell0673

Fiona, would the operator see both entries? I can imagine that distinction being clear to a developer and still looking like two finished coupons on the shift screen.

15 points
FI
FionaBell0673
Replying to LouisBennett0746

Two observations in diagnostics, one result in production totals. Label the views. I wouldn't make operators deduce it from timestamps.

-3 points
CA
CallumBennett0708
Replying to CallumBennett0708

Chen, the controller record has a job number and completion state but our reconnect handler only passes the state onward; Fiona and Louis, both screens currently use the same event list, so yes, they both show the extra completion

21 points
OW
OwenCarter1008
Replying to CallumBennett0708

I've watched a class treat job number as a permanent identity because the exercise never restarted its producer, so I'd ask what happens to that number at restart before making it the only key here

5 points
TH
TheoBell0671
Replying to CallumBennett0708

And who reconciles the coupon already counted twice? Fixing the display for the next run won't explain the old total. I'd want the commissioning owner to check that against the job evidence, with the correction visible rather than quietly editing the number.

11 points
RU
RuthBlair
Replying to CallumBennett0708

Same coupon still in the fixture, Callum, or had it been removed?

12 points
LI
LiamBarnes0577
Replying to RuthBlair

Ruth, that observation could help reconciliation, but the occupied fixture alone would not identify which verification completed. I would keep physical state and the recorded job evidence together.

8 points
OL
Olivia_Briggs
Replying to CallumBennett0708

For a beginner's handover, I'd put one actual reconnect example beside the two screens. Show the repeated observation and where its existing result is found. If identity is missing, the example should stop at unresolved, not supply a guessed number.

8 points
CA
CallumBennett0708
Replying to RuthBlair

Ruth, it had been removed; the commissioning owner matched the saved record to the identified coupon in the inspection log and has recorded the duplicate-count correction, while the developer is separating observations from results

16 points
FE
FelixAli0197
Replying to Olivia_Briggs

Olivia's example sounds useful. We had a handover full of normal screenshots and no explanation of why yesterday's information might reappear; the person on shift naturally treated every new row as new work. I'd test this wording with somebody who hasn't helped write it.

18 points
TH
TheoAli0236
Replying to OwenCarter1008

Has the job-number restart question been answered, Callum, since that determines whether a repeated number can safely be matched to the old result at all?

9 points
CA
CallumBennett0708
Replying to TheoAli0236

Owen and Theo Ali, the job counter can restart from its initial value and this interface exposes no producer-session identifier, so the developer has made that restart case unresolved instead of reusing the earlier result

19 points
DA
DavidBrown0954
Replying to CallumBennett0708

What happens on the screen in that unresolved case? I'd expect a reader to know which total is confirmed and which job needs attention, without opening a developer log.

23 points
CH
ChenChan1051
Replying to DavidBrown0954

And don't call that a new completed job merely because its number is unfamiliar.

12 points
CA
CallumBennett0708
Replying to DavidBrown0954

The replay build shows confirmed results separately and a named unresolved observation with no count increment; held-state reconnect repeats one result, while the restart-number case stays unresolved, and nothing in this monitor resubmits work

7 points
TH
TheoBell0671
Replying to CallumBennett0708

That gives maintenance an honest boundary. Keep the producer-identity limitation in the handover with the reconciliation owner, Callum; otherwise somebody will see the unchanged total after a restart and decide the monitor simply needs another reconnect.

10 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.