Start with the occurrence behind each attachment: event time, fixture identifier and program revision where available. I found two fixtures called A in our own captions. A tidy filename can conceal a very untidy comparison.
A support ticket whose attachments describe different spacer jobs
JonasBarnes0546 · 4 Aug 2025, 03:56 UTC
18 replies
The workshop already found one mismatch. Program export is from before a tray changeover update. Video is later. We have not identified which version was running in the video.
16 pointsCan the controls maintainer identify the installed revision at the time from their change history? If not, leave that occurrence incomplete and arrange a new capture with the setup identified.
18 pointsThey can identify the update date but not prove it was the loaded program for that clip. We are leaving the old video as background and requesting a complete new occurrence.
15 pointsTell the seller why. Otherwise they may keep comparing new messages with that old export because it is the only program file they have.
16 pointsWho is doing the capture when the usual contact is away? Someone needs to own it.
4 pointsOur maintenance lead. I am coordinating the supplier messages, not diagnosing the station. The lead has the exact attachment list and has agreed to identify the next occurrence.
12 pointsThat division sounds workable. I would ask support to name the step or state they need, rather than making your maintenance lead guess what more detail means.
13 pointsDoes the station show an actual fault, Jonas, or are we calling a long wait a stop again?
15 pointsThe new capture shows a wait for the outgoing tray position. No robot fault message. The old ticket subject just said robot stops, which I have narrowed now.
17 pointsSend the station step and the ordinary tray-position input from the same occurrence. Then support can ask why that expected condition was absent. Do not change its timeout just to make the waiting message disappear.
25 pointsJonas, does that outgoing tray have an identifier distinct from the incoming one? I would keep the physical station names in the report too.
17 pointsYes, each tray station is identified. Support has the matched step and input capture, and maintenance is checking the outgoing tray's locating arrangement.
22 pointsWhat did the input do during that occurrence: stay absent, or appear and then drop?
12 pointsAnd has your usual contact been told the old export is no longer the one to send? Otherwise the next handover brings it straight back.
8 pointsIt stayed absent during the captured wait, Hassan. Maintenance found the target out of position and is checking the intended arrangement before repair. The revised ticket pack replaces the old export for future correspondence.
12 pointsI also sent the handover to our returning contact, Caleb. The unclear old occurrence remains labelled as such; we are not pretending the target finding explains every earlier pause.
8 pointsOnce that target is repaired, have the agreed checks cover the reported wait and the normal tray change. A target looking straight is not the complete station test.
5 pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .