Which screen should I capture when our FR5 tray job hangs?

NaomiBell0680 · 29 Jun 2025, 03:56 UTC

Closed
NA
NaomiBell0680
Our FR5 connector-loading job hangs after a tray swap. Seller from Alibaba asked for more information after my video. Fair enough... I filmed the arm, not the message. Which screen matters?

8 replies

RA
RaviAdams0128
Replying to NaomiBell0680

Both the station message and the pendant state, tied to the same occurrence; include where the sequence stopped and which tray was fitted.

20points
NA
NaomiBell0680
Replying to RaviAdams0128

I've got a station photo from that stop. It says tray accepted, waiting cycle enable. No pendant photo. Tray was the shallow connector one.

3points
RA
RaviAdams0128
Replying to NaomiBell0680

Can the integrator identify what cycle enable means in that sequence? The wording does not tell us which device supplies it.

9points
NA
NaomiBell0680
Replying to RaviAdams0128

They say a PLC condition, but their first reply still called it a tray sensor issue. I've asked which input or state is missing. Pick one explanation, please.

12points
RA
RaviAdams0128
Replying to NaomiBell0680

Ask for the condition's name and the relevant capture, not a choice between guesses.

21points
CA
CallumBell0621
Replying to NaomiBell0680

It could involve more than one condition, Naomi. Our enable depended on several checks, so the screen name did not point to one sensor by itself.

11points
NA
NaomiBell0680
Replying to CallumBell0621

Fair enough, Callum, I meant I want them to explain the link. They've named the combined condition now and requested a PLC-state capture from the integrator.

18points
RA
RaviAdams0128
Replying to NaomiBell0680

Keep that request with the original stop report; the next shift needs to know what to capture, not just that support is investigating.

10points