Why rank the FR10 when the demos unload into different trays?
YasminChan1050 · 21 Feb 2026, 21:26 UTC
17 replies
What happens to the sleeves after the demonstration tray is full? Ask for that before comparing the robot cycle times.
6pointsOur tray goes to assembly. Their demonstration tray would need unloading into ours first.
13pointsDid either demonstration show release into the awkward pockets, or did the video stop while the sleeve was still held?
13pointsPrice the transfer between trays as a distinct option. It may still be workable, but the person doing it and the space for both trays belong in that price.
8pointsCallum, our-tray demo showed release. Two sleeves needed the demonstrator to straighten them afterwards.
25pointsThen ask what the ordinary loader would do with those two. I'd want the supplier to explain the placement problem before a tutor quietly inherits a manual finishing step.
19pointsLeah, manual finishing might be an honest option if it is acceptable and costed. The trouble is presenting it as an autonomous transfer and then telling the loader it is only an occasional touch.
11pointsTwo out of how many? Occasional needs a denominator.
5pointsWere those two pockets damaged, or were they ordinary examples of the tray you intend to use? I would not ask a new tool to accommodate scrap without first knowing the distinction.
14pointsTwo out of twelve sleeves. Tray inspected and acceptable for assembly use; those pockets are not damaged.
2pointsAnil's option deserves a price, not a euphemism. Include the loader examining the tray, identifying a poor placement, and putting it right through an agreed method. Counting only the seconds spent straightening two sleeves will flatter it.
9pointsAnd show how the loader knows a sleeve is properly seated afterwards
22pointsDoes assembly accept a different tray at all? Could remove the second transfer, if they do.
16pointsWorth asking, Val, but also who returns the empty trays. We once priced new trays and forgot the collection job entirely.
9pointsAssembly will consider another tray, provided its fixture interface stays unchanged. Supplier is pricing a compatible receiving tray.
4pointsThat changes the choice usefully. Anil, I accept your point about a costed manual option; I'd keep it beside this new tray proposal until the actual placement and handover are demonstrated.
25pointsHas the proposed receiving tray been assessed at assembly yet, including the fixture interface and empty return? I would hold the shortlist until that answer joins the handling cost.
8pointsDiscussion closed
This discussion is closed to new replies after six months without activity. Last activity: .