Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,716discussions

A

Our UR5e panel report starts with a sheet already separated

AnnaBaker0503 · 23 points · Applications & integration · 5 Apr 2026
0replies
L

Our 221 brackets are nearly finished only if retries count as new brackets

LeoAllen0275 · 26 points · Applications & integration · 5 Apr 2026
5replies
A

one sealed panel is not our stacked supply

AmyAllen0293 · 17 points · Applications & integration · 5 Apr 2026
0replies
L

The FR10 pallet section loses support beneath two turned cartons

LeahChen1191 · 19 points · Applications & integration · 5 Apr 2026
0replies
Y

I cannot call the UR5e tray locator finished after the replacement-tray miss

YasminBrown0876 · 26 points · Applications & integration · 5 Apr 2026
16replies
A

I cannot select the UR5e layer with unsupported carton ends

AnikaBrooks0856 · 23 points · Applications & integration · 5 Apr 2026
16replies
L

Why buy a bigger clamp when our bracket rocks before clamping?

LeahAbbott0060 · 30 points · Applications & integration · 4 Apr 2026
1replies
H

A workshop packing department: Before I sign off a pallet drawing full of neat rectangles

HarishBell0663 · 21 points · Applications & integration · 4 Apr 2026
0replies
H

We planned 29, but the count includes repeat inspections (per-item inspection)

HassanBennett0704 · 13 points · Applications & integration · 4 Apr 2026
10replies
W

Is alternating the layers actually right for our cartons? (Universal Robots UR5e)

WillAli0226 · 40 points · Applications & integration · 4 Apr 2026
13replies
B

Our tray-locating change still needs an honest assessment (tray-to-fixture transfer)

BrunoBarnes0539 · 11 points · Applications & integration · 4 Apr 2026
6replies
S

Our FR5 bracket estimate borrows acceptance from the correction bench

SarahCarter1024 · 21 points · Applications & integration · 4 Apr 2026
9replies
F

Which FR10 receipt should clear our pending fixture-inspection request?

FelixBaker0458 · 37 points · Applications & integration · 4 Apr 2026
10replies
I

our sensor-cover insert fits the wrong way round as well as the wrong recipe

ImranAli0218 · 7 points · Applications & integration · 3 Apr 2026
6replies
J

How do I distinguish these FR5 inserts before buying readers?

JordanBriggs · 25 points · Applications & integration · 3 Apr 2026
16replies
F

I cannot choose our FR10 panel tool from the loose-sheet test

FionaAdams0151 · 22 points · Applications & integration · 2 Apr 2026
19replies
C

Why is the turned carton supported by an empty space in our FR10 drawing?

CarlaChan1097 · 2 points · Applications & integration · 2 Apr 2026
4replies
A

Reconnect turns an old completion into a new one (part acceptance reporting)

AmyBarnes0554 · 9 points · Applications & integration · 2 Apr 2026
5replies
S

Our FR10 dashboard has 166 checks and calls 171 brackets nearly done

SofiaAbbott0021 · 28 points · Applications & integration · 2 Apr 2026
12replies
W

How do I price a UR5e pallet plan whose turned cases are not supported?

WillAli0226 · 39 points · Applications & integration · 1 Apr 2026
6replies