Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,712discussions

L

A carton palletising project: Which drawings would connect carton support with gripper access?

LucyBennett0741 · 33 points · Applications & integration · 2 Aug 2026
3replies
M

Which drawings would connect carton support with gripper access? (Fairino FR10, palletising sealed product cartons)

MayaBrown0910 · 2 points · Applications & integration · 2 Aug 2026
1replies
R

Fairino FR5 pallet plan: support and tool access need the same review

RebeccaBrooks0865 · 22 points · Applications & integration · 2 Aug 2026
13replies
K

Before we add restraint to a fixture we don't fully understand - defining dimensional control for bracket welding

KaiChen1150 · 18 points · Applications & integration · 2 Aug 2026
14replies
A

What should I ask after an unconfirmed gripper-kit substitution? (Fairino FR5, placing small plastic samples in trays)

AmaraAbbott0078 · 15 points · Applications & integration · 1 Aug 2026
1replies
M

Our placing small plastic samples in trays tooling changed between the trial and delivery (Fairino FR5)

MayaArcher0388 · 20 points · Applications & integration · 1 Aug 2026
10replies
O

The layer pattern fits, but some cartons sit over gaps

OscarChen1141 · 7 points · Applications & integration · 1 Aug 2026
0replies
D

A compact fixture loading station: What should I report about this incomplete parts tray unloading improvement?

DanielAli0217 · 32 points · Applications & integration · 1 Aug 2026
14replies
O

What should count as dimensional acceptance after welding? (Fairino FR10)

OmarBarnes0578 · 7 points · Applications & integration · 1 Aug 2026
0replies
I

Do we need more than edge detection after reconnect? - part acceptance reporting

IsaacBrown0955 · 14 points · Applications & integration · 1 Aug 2026
0replies
C

Which bracket condition do our old UR5e planning records actually measure?

ClaraAli0176 · 31 points · Applications & integration · 1 Aug 2026
7replies
V

A sealed stainless panel is not yet a single delivered panel

VictorChen1142 · 7 points · Applications & integration · 1 Aug 2026
0replies
A

Can I stop this FR5 pouch trial even though the transfer works?

Aileen_Casey · 22 points · Applications & integration · 1 Aug 2026
12replies
F

Where do the turned dispatch cartons bear in our UR5e pattern?

FionaCarter1021 · 14 points · Applications & integration · 1 Aug 2026
4replies
S

Our 98-plate batch is nearly done only if repeat inspections are new plates

StevenCasey · 25 points · Applications & integration · 1 Aug 2026
11replies
L

Does the delivered UR5e adapter preserve the shell trial we approved?

LucyAdams0132 · 31 points · Applications & integration · 1 Aug 2026
0replies
S

The panel seals on the bench, but I need it delivered singly from a stack

SamChan1116 · 9 points · Applications & integration · 1 Aug 2026
14replies
O

Working bag transfer, growing preparation bill

OmarCarter1013 · 26 points · Applications & integration · 1 Aug 2026
1replies
O

Different blank projections, no blank dimensions on our sheet

OscarBrooks0793 · 19 points · Applications & integration · 1 Aug 2026
10replies
I

Which support view should accompany the occupied FR10 release sequence?

IsaacBarnes0607 · 10 points · Applications & integration · 1 Aug 2026
2replies