Programming & support

Work through software, SDKs, connectivity, and commissioning.

Start a discussion
Started in

2,346 discussions

V

Two suppliers, two meanings of ready (Fairino FR5, planning a lathe load-and-unload sequence)

VictorAdams0098 · 38 points · Programming & support · 27 Aug 2026
4replies
T

A PLC-coordinated inspection cell: Why does our offline retry test accept the wrong result?

TheoAbbott0062 · 16 points · Programming & support · 26 Aug 2026
8replies
S

A precision metal-parts inspection area: Universal Robots UR5e inspection plan: scratches or changing reflections?

SaraAdams0113 · 32 points · Programming & support · 26 Aug 2026
20replies
A

Recovering fixture verification bookkeeping across a crash (Fairino FR5)

AnnaCarter1025 · 6 points · Programming & support · 26 Aug 2026
11replies
V

Getting consistent inspection evidence before commissioning

VictorArcher0359 · 17 points · Programming & support · 26 Aug 2026
0replies
C

Our application crashed after sending the request (Fairino FR10)

CarlaCarter1010 · 13 points · Programming & support · 26 Aug 2026
1replies
C

Getting consistent inspection evidence before commissioning (planning camera inspection of reflective parts)

ClaraBrown0872 · 27 points · Programming & support · 26 Aug 2026
13replies
F

Bright streaks move when we present the part differently (Fairino FR10)

FionaBrooks0847 · 33 points · Programming & support · 26 Aug 2026
18replies
S

Bright streaks move when we present the part differently

SaraBarnes0548 · 7 points · Programming & support · 26 Aug 2026
7replies
R

Should startup resubmit a job with no saved result? - inspection-cycle execution

RaviChen1172 · 32 points · Programming & support · 26 Aug 2026
7replies
N

Our normal tray loop works until something stops it (fixture-to-tray transfer)

NoraBennett0757 · 6 points · Programming & support · 26 Aug 2026
5replies
S

How do I build a trustworthy reference set for a polished metal cover?

SaraAli0200 · 26 points · Programming & support · 26 Aug 2026
5replies
B

Are we teaching our camera to reject reflections? (planning camera inspection of reflective parts)

BrunoBell0626 · 19 points · Programming & support · 26 Aug 2026
3replies
I

Our interface drawing agrees with itself until you read the notes (Fairino FR5, defining a lathe tending handshake)

ImranChen1175 · 28 points · Programming & support · 25 Aug 2026
18replies
N

Bright streaks move when we present the part differently - inspecting reflective surfaces for scratches

NoahBaker0455 · 17 points · Programming & support · 25 Aug 2026
21replies
E

A cosmetic components workshop: How do I build a trustworthy reference set for a reflective aluminium bezel?

EmmaAllen0289 · 37 points · Programming & support · 25 Aug 2026
21replies
H

How can our bezel reference teach the UR5e what finish to tolerate?

HassanAdams0095 · 31 points · Programming & support · 25 Aug 2026
10replies
C

How do I stop our UR5e cover folder turning reflections into verdicts?

ChenBrown0877 · 6 points · Programming & support · 25 Aug 2026
1replies
I

Who will own the physical cover references behind our UR5e camera labels?

ImranBennett0740 · 6 points · Programming & support · 25 Aug 2026
0replies
S

Which event should the UR5e bush-handover sheet call received?

SaraBarnes0548 · 12 points · Programming & support · 25 Aug 2026
11replies