A precision metal-parts inspection area: What counts as a confirmed defect on a reflective surface?

LeoBaker0449 · 19 points · Programming & support · 27 Aug 2026
6replies
O

How do I get both suppliers to define ready? (defining a lathe tending handshake)

OliverBell0624 · 19 points · Programming & support · 27 Aug 2026
14replies
J

The crash landed between sending work and saving its result (fixture verification)

JasperAli0203 · 31 points · Programming & support · 27 Aug 2026
3replies
R

A fixed camera, small presentation changes, very different streaks (planning camera inspection of reflective parts)

RosaAbbott0031 · 34 points · Programming & support · 27 Aug 2026
19replies
F

The scratch labels look less certain than the images suggest (planning camera inspection of reflective parts)

FionaBrooks0847 · 20 points · Programming & support · 27 Aug 2026
1replies
S

Universal Robots UR5e: How do I keep an uncertain attempt out of automatic resubmission?

SofiaAdams0108 · 16 points · Programming & support · 27 Aug 2026
16replies
C

Testing status parsing without the workshop cell (Fairino FR5, sample status display)

ChenChen1138 · 13 points · Programming & support · 27 Aug 2026
2replies
C

A cosmetic components workshop: A fixed camera, small presentation changes, very different streaks

CarlaBrooks0836 · 25 points · Programming & support · 27 Aug 2026
0replies
E

Testing duplicate and reordered events for Fairino FR10 (fixture-check completion reporting)

EllaArcher0381 · 27 points · Programming & support · 27 Aug 2026
18replies
C

Fairino FR10: Our saved handling job needs a better handover

CallumArcher0360 · 14 points · Programming & support · 27 Aug 2026
19replies
P

How do I build a trustworthy reference set for a polished metal cover? (Fairino FR10)

PriyaAdams0133 · 23 points · Programming & support · 27 Aug 2026
11replies
V

Two suppliers, two meanings of ready (Fairino FR5, planning a lathe load-and-unload sequence)

VictorAdams0098 · 38 points · Programming & support · 27 Aug 2026
4replies
T

A PLC-coordinated inspection cell: Why does our offline retry test accept the wrong result?

TheoAbbott0062 · 16 points · Programming & support · 26 Aug 2026
8replies
S

A precision metal-parts inspection area: Universal Robots UR5e inspection plan: scratches or changing reflections?

SaraAdams0113 · 32 points · Programming & support · 26 Aug 2026
20replies
A

Recovering fixture verification bookkeeping across a crash (Fairino FR5)

AnnaCarter1025 · 6 points · Programming & support · 26 Aug 2026
11replies
V

Getting consistent inspection evidence before commissioning

VictorArcher0359 · 17 points · Programming & support · 26 Aug 2026
0replies
C

Our application crashed after sending the request (Fairino FR10)

CarlaCarter1010 · 13 points · Programming & support · 26 Aug 2026
1replies
C

Getting consistent inspection evidence before commissioning (planning camera inspection of reflective parts)

ClaraBrown0872 · 27 points · Programming & support · 26 Aug 2026
13replies
F

Bright streaks move when we present the part differently (Fairino FR10)

FionaBrooks0847 · 33 points · Programming & support · 26 Aug 2026
18replies
S

Bright streaks move when we present the part differently

SaraBarnes0548 · 7 points · Programming & support · 26 Aug 2026
7replies